Permit: T22CM03056
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
3587 N KELLEN CANYON CT
Address NEW:
3587 N KELLEN CANYON CT
Apply Date:
04/25/2022
Applicant:
Helen Ormsby
Description:
SFR DRHOH35G21 T21-M0042: REV 1 as-built wall location
Permit Reviews
Permit Number - T22CM03056
Permit Status: Issued
Permit Description: SFR DRHOH35G21 T21-M0042: REV 1 as-built wall location
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/12/2023 | RESIDENTIAL NEW DWELLING v.1 | 01/13/2023 | APPROVED |
| 02/10/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/13/2023 | APPROVED |
| 03/20/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/22/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM03056
Permit Status: Issued
Permit Description: SFR DRHOH35G21 T21-M0042: REV 1 as-built wall location
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/25/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 04/25/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2018-112(P21WP00113) IS ACCEPTED AND RELEASED BY PCRWRD |
Conditions
Permit Number - T22CM03056
Permit Status: Issued
Permit Description: SFR DRHOH35G21 T21-M0042: REV 1 as-built wall location
| Date | Description | Comments |
|---|---|---|
| 04/25/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM03056
Permite Description: SFR DRHOH35G21 T21-M0042: REV 1 as-built wall location
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Preslab | N/A | Not Ready | |
| 12/12/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | missing blocking at registers in great room area. add a receptacle to follow 6’ 12’ rule. fire stop all top penetrations. make up smoke detector in 1st bedroom. |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM03056
Permit Description: SFR DRHOH35G21 T21-M0042: REV 1 as-built wall location
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} | |
| 10/14/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
| 10/14/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
| 10/17/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/17/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 10/14/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval missing hold down} | |
| 11/16/2022 | COT - RSBU - Roof Nailing | Passed | ||
| 11/16/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/18/2022 | COT - RSBU - Preslab | Passed | ||
| 12/13/2022 | COT - RSPL - Gas Pressure Test | Passed | ||
| 12/13/2022 | RSME - Mechanical Progress | Passed | ||
| 12/13/2022 | COT - LCBU - Framing | Passed | ||
| 12/14/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 12/14/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 12/16/2022 | COT - RSEL - Construction Power | Passed | ||
| 12/22/2022 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 01/09/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 01/09/2023 | COT - RSPL - Sewer | Passed | ||
| 01/13/2023 | BULD - Electrical Clearance | Passed | ||
| 02/27/2023 | COT - BULD - SWG Clearance | Passed | Ok to set gas meter. | |
| 03/14/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 03/14/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/14/2023 | COT - RSEL - Electrical Final | Passed | ||
| 03/14/2023 | RSBU - Building Final | Passed | ||
| 03/14/2023 | COT - RSME - Mechanical Final | Passed |