Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
04/25/2022
Applicant:
Helen Ormsby
Description:
SFR DRHOH35G21 T21-M0042 REV1: As built for patio wall location

Permit Reviews

Permit Number - T22CM03049
Permit Status: Complete
Permit Description: SFR DRHOH35G21 T21-M0042 REV1: As built for patio wall location
Start Date Submittal Complete Date Status  
03/20/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/20/2023 APPROVED Review Details
01/12/2023 RESIDENTIAL NEW DWELLING v.1 01/13/2023 APPROVED Review Details

Conditions

Permit Number - T22CM03049
Permit Status: Complete
Permit Description: SFR DRHOH35G21 T21-M0042 REV1: As built for patio wall location
Date Description Comments
04/25/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/25/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/25/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2018-112(P21WP00113) IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM03049
Permite Description: SFR DRHOH35G21 T21-M0042 REV1: As built for patio wall location
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSPL - Rough Soil N/A Not Ready
01/24/2023 COT - LCPL - Plumbing Intermediate N/A Not Ready space pex lines from light fixture 12” minimum.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM03049
Permit Description: SFR DRHOH35G21 T21-M0042 REV1: As built for patio wall location
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/25/2022 COT - RSPL - Plumbing Final Passed {Activity date: 04/25/2022; Status: Approved; Inspector: RPARSON1; Comment: Entered by RPARSON1 - NO FINAL UNTIL THE PUBLIC SEWER G-2018-112(P21WP00113) IS ACCEPTED AND RELEASED BY PCRWRD}
12/07/2022 COT - RSEL - Electrical Underground Passed
12/14/2022 COT - RSBU - Preslab Passed
12/29/2022 COT - RSEL - Grounding/Bonding Passed
12/29/2022 COT - RSEL - Construction Power Passed clearance for TEP ECO.
12/29/2022 COT - RSBU - Roof Nailing Passed
12/29/2022 COT - RSBU - Exterior Clips/Sheathing Passed
01/05/2023 COT - RSPL - Sewer Passed
01/24/2023 COT - RSPL - Gas Pressure Test Passed holding 15 psi.
01/24/2023 COT - RSPL - Yard Water Line Passed
01/24/2023 COT - LCBU - Framing Passed
01/24/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
01/25/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/25/2023 RSME - Mechanical Progress Passed
02/15/2023 COT - HCBU - Interior Shear Bracing Passed corrections were made
04/05/2023 BULD - Electrical Clearance Passed Clearance for TEP ECO. 4/5/2023
04/20/2023 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 4/20/2023
04/25/2023 COT - RSEL - Outdoor Lighting Passed
04/25/2023 COT - RSME - Mechanical Final Passed
04/25/2023 RSBU - Building Final Passed
04/25/2023 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW
SVB 8 PT REPORT-2023-03-03_V1.PDF DOCUMENTS VIEW
SVB 8 SIC-2023-03-03_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SVB 8 REV1 PLOT PLAN_V1.PDF DOCUMENTS VIEW
SVB 8 REV1 NARRATIVE LETTER_V1.PDF DOCUMENTS VIEW