Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM03006
Permit Details
Apply Date:
04/21/2022
Applicant:
Ladonna Martin
Description:
R - SYSTEM SIZE: 16195W DC, 11890W AC- MODULES: (41) LG ELECTRONICS: LG395Q1C-A6- INVERTERS: (41)
Permit Reviews
Permit Number - T22CM03006
Permit Status: Withdrawn
Permit Description: R - SYSTEM SIZE: 16195W DC, 11890W AC- MODULES: (41) LG ELECTRONICS: LG395Q1C-A6- INVERTERS: (41)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/21/2022 | OTHER | 06/21/2022 | COMPLETED |
12/29/2022 | RESIDENTIAL SOLAR v.1 | 01/24/2023 | APPROVED |
Conditions
Permit Number - T22CM03006
Permit Status: Withdrawn
Permit Description: R - SYSTEM SIZE: 16195W DC, 11890W AC- MODULES: (41) LG ELECTRONICS: LG395Q1C-A6- INVERTERS: (41)
Date | Description | Comments |
---|---|---|
04/21/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Completed Inspections
Permit Status: Withdrawn
Permit Number: T22CM03006
Permit Description: R - SYSTEM SIZE: 16195W DC, 11890W AC- MODULES: (41) LG ELECTRONICS: LG395Q1C-A6- INVERTERS: (41)
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/10/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 08/10/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - CODE INCR/POWERKILL} | |
08/10/2022 | COT - RSEL - Service Upgrade | Passed | {Activity date: 08/10/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, INCR Clearance was called into TEP at 1:30 Marcia (power-kill) Pending solar} |
|
01/25/2023 | COT - RSEL - Electrical Final | Passed | ||
01/25/2023 | RSBU - Building Final | Passed | solar | |
01/25/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |