Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM02991
Permit Details
Apply Date:
04/21/2022
Applicant:
ramon polanco
Description:
SFR BRIOS1432 T20-M0059
Permit Reviews
Permit Number - T22CM02991
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/21/2022 | OTHER | 05/18/2022 | COMPLETED |
02/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/06/2024 | APPROVED |
03/04/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/06/2024 | APPROVED |
02/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/27/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - T22CM02991
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Date | Description | Comments |
---|---|---|
04/21/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
05/04/2022 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
05/04/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
02/27/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
02/27/2024 | Water Meter Size | |
02/27/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/27/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/27/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
02/27/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM02991
Permite Description: SFR BRIOS1432 T20-M0059
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSEL - Electrical Underground | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
11/14/2023 | COT - RSEL - Construction Power | N/A | Not Applicable | |
11/14/2023 | COT - RSBU - Sustainability | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM02991
Permit Description: SFR BRIOS1432 T20-M0059
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/15/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 07/15/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
08/15/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 08/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
08/15/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
09/08/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 09/08/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
01/27/2023 | COT - LCBU - Framing | Passed | okay to sheet rock. | |
01/27/2023 | COT - RSBU - Preslab | Passed | ||
01/27/2023 | COT - LCPL - Plumbing Intermediate | Passed | plumbing pipes and tubs are installed. okay to sheet rock. | |
01/27/2023 | COT - RSEL - Electrical Underground | Passed | N/A | |
01/27/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | okay to stucco. | |
01/27/2023 | RSEL - Electrical Progress | Passed | okay to sheet rock. | |
01/27/2023 | RSME - Mechanical Progress | Passed | ductwork and registers are installed. okay to sheet rock. | |
02/22/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
09/01/2023 | BULD - Electrical Clearance | Passed | ||
11/13/2023 | COT - RSPL - Plumbing Final | Passed | ||
11/13/2023 | COT - RSEL - Electrical Final | Passed | ||
11/13/2023 | COT - RSME - Mechanical Final | Passed | ||
11/13/2023 | RSBU - Building Final | Passed | ||
11/14/2023 | COT - RSPL - Yard Water Line | Passed | ||
11/14/2023 | COT - RSPL - Sewer | Passed | ||
02/12/2024 | ENGR Engineering Final | Passed |