Permit: T22CM02985
Permit Details
Apply Date:
04/21/2022
Applicant:
burak bekat
Description:
SFR BRIOS1432 T20-M0059
Permit Reviews
Permit Number - T22CM02985
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/21/2022 | OTHER | 05/18/2022 | COMPLETED |
12/06/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/08/2023 | APPROVED |
Conditions
Permit Number - T22CM02985
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Date | Description | Comments |
---|---|---|
04/21/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
05/04/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
05/04/2022 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
05/04/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/04/2022 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
05/04/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
05/04/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
05/09/2022 | WATER METER SIZE |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM02985
Permite Description: SFR BRIOS1432 T20-M0059
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
09/28/2023 | COT - RSBU - Sustainability | N/A | Not Applicable | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
08/30/2023 | ENGR Engineering Final | N/A | Partial Pass | Roof drain splash pads and back ordered plants need to be completed prior to next inspection TC of O #1 |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM02985
Permit Description: SFR BRIOS1432 T20-M0059
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/28/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 06/28/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
08/02/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 08/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
08/02/2022 | COT - RSBU - Preslab | Passed | {Activity date: 08/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
08/02/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
08/29/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 08/29/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/26/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor } |
|
09/16/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 09/16/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} | |
10/20/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} | |
01/05/2023 | COT - LCBU - Framing | Passed | ||
01/05/2023 | RSME - Mechanical Progress | Passed | ||
01/05/2023 | RSEL - Electrical Progress | Passed | ||
01/05/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
01/06/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
02/10/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
08/02/2023 | BULD - Electrical Clearance | Passed | ||
09/29/2023 | COT - RSEL - Electrical Final | Passed | ||
09/28/2023 | COT - RSME - Mechanical Final | Passed | ||
09/28/2023 | COT - RSPL - Sewer | Passed | ||
09/28/2023 | COT - RSEL - Construction Power | Passed | ||
11/27/2023 | ENGR Engineering Final | Passed | ||
12/01/2023 | RSBU - Building Final | Passed | Ok for C OF O |