Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
04/21/2022
Applicant:
Description:
ADU unit #B

Permit Reviews

Permit Number - T22CM02983
Permit Status: Issued
Permit Description: ADU unit #B
Start Date Submittal Complete Date Status  
04/21/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 05/05/2022 COMPLETED Review Details
07/05/2022 RESUBMITTAL 07/18/2022 COMPLETED Review Details
09/25/2023 RESIDENTIAL NEW DWELLING v.1 10/05/2023 APPROVED Review Details
03/18/2023 RESIDENTIAL NEW DWELLING v.1 03/28/2023 APPROVED Review Details
01/05/2023 RESIDENTIAL NEW DWELLING v.1 02/02/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM02983
Permit Status: Issued
Permit Description: ADU unit #B
Total Outstanding Activity Conditions - 1
Date Name
02/02/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - T22CM02983
Permit Status: Issued
Permit Description: ADU unit #B
Date Description Comments
03/27/2023 Please contact Pima County Addressing for a new address. Addressing@pima.gov or 520-724-9512
02/14/2023 Contractor's active Arizona Contractor's License number for specified scope of work required prior to issuance of permit.
01/20/2023 Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection.
02/14/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM02983
Permite Description: ADU unit #B
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
07/12/2022 COT - LCPL - Plumbing Intermediate N/A Canceled {Activity date: 07/12/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
07/12/2022 RSME - Mechanical Progress N/A Canceled {Activity date: 07/12/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
04/21/2023 COT - RSEL - Grounding/Bonding N/A Re-inspection required No Ufer ground, verify grounding and bonding

Completed Inspections

Permit Status: Issued
Permit Number: T22CM02983
Permit Description: ADU unit #B
Total Completed Inspections - 14
Date Description Inspector Results Comments
04/20/2023 COT - RSPL - Rough Soil Passed
04/21/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
05/25/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
05/25/2023 COT - RSBU - Roof Nailing Passed
07/18/2023 COT - RSEL - Electrical Underground Passed 7/18/23 Trench 24 inches deep will ribbon with caution tape at 12 inches
08/22/2023 COT - RSPL - Yard Water Line Passed 8/22/23: ok to cover water line from meter to new guest house.
10/18/2023 BULD - Electrical Clearance Passed Approved for unit #1 panel upgrade and relocation to the casita, INCR clearance to TEP is required for the cutover
11/08/2023 COT - RSEL - Grounding/Bonding Passed 11/8/23: electrical panel is properly grounded and bonded to water line.
11/08/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11/8/23: Construction is complete on unit two. Mechanical, electrical, and plumbing is complete and operational. Okay to issue Certificate of Occupancy for unit two.
11/08/2023 RSBU - Building Final Passed 11/8/23: Construction is complete on unit two. Mechanical, electrical, and plumbing is complete and operational. Okay to issue Certificate of Occupancy for unit two.
11/08/2023 COT - RSPL - Plumbing Final Passed 11/8/23: Construction is complete on unit two. Mechanical, electrical, and plumbing is complete and operational. Okay to issue Certificate of Occupancy for unit two.
11/08/2023 COT - RSEL - Electrical Final Passed 11/8/23: Construction is complete on unit two. Mechanical, electrical, and plumbing is complete and operational. Okay to issue Certificate of Occupancy for unit two.
11/08/2023 COT - RSEL - Outdoor Lighting Passed Front and rear porch lights meet plan specifications.
11/08/2023 COT - RSME - Mechanical Final Passed 11/8/23: Construction is complete on unit two. Mechanical, electrical, and plumbing is complete and operational. Okay to issue Certificate of Occupancy for unit two.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
09_18_23 (1)_V1.PDF DOCUMENTS VIEW
CONS-REV3_1 PLAN SET LUIS SOCORRO GONZALEZ T22CM02983_V1.PDF DOCUMENTS VIEW
REV3_1 RESPONSE LETTER LUIS SOCORRO GONZALEZ T22CM02938_V1.PDF DOCUMENTS VIEW
CONS-MR LUIS SOCORRO GONZALEZ 3 (2)_V1.PDF DOCUMENTS VIEW
ACCULOAD REPORT - MR LUIS SOCORRO GONZALEZ 2 (3)_V1.PDF DOCUMENTS VIEW
MR LUIS SOCORRO GONZALEZ 2 (4)_V1.PDF DOCUMENTS VIEW
MR LUIS SOCORRO GONZALEZ 2 (EQUIPMENT) (3)_V1.PDF DOCUMENTS VIEW