Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
04/21/2022
Applicant:
joe oneill
Description:
Construction of 3 baseball fields, new restroom, walking paths & associated parking (DP submitted se

Permit Reviews

Permit Number - T22CM02977
Permit Status: Issued
Permit Description: Construction of 3 baseball fields, new restroom, walking paths & associated parking (DP submitted se
Start Date Submittal Complete Date Status  
04/21/2022 COMMERCIAL - NEW 05/31/2022 COMPLETED Review Details
03/16/2023 COMMERCIAL REVIEW - FULL v.2 04/24/2023 REQUIRES RESUBMIT Review Details
05/09/2023 COMMERCIAL REVIEW - FULL v.3 06/12/2023 APPROVED Review Details
06/12/2023 ZZZBUILDING RESTAMP REVIEW v.1 06/18/2023 APPROVED Review Details
03/16/2023 COMMERCIAL REVIEW - FULL v.1 03/16/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - T22CM02977
Permit Status: Issued
Permit Description: Construction of 3 baseball fields, new restroom, walking paths & associated parking (DP submitted se
Total Outstanding Activity Conditions - 14
Date Name
05/02/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
05/02/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
05/02/2022 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
05/02/2022 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
05/02/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
05/02/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
05/02/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/02/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
05/16/2022 Special inspection for outside lighting
06/12/2023 AIR BALANCING REPORT IS REQUIRED.
06/12/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
06/12/2023 WATER STERILIZATION REPORT IS REQUIRED.
06/18/2023 Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.
06/18/2023 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM02977
Permite Description: Construction of 3 baseball fields, new restroom, walking paths & associated parking (DP submitted se
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
09/20/2024 COT - LCPL - Plumbing Intermediate N/A Not Ready 8/29/24: 3" PVC schedule 40 from ball valve to P.O.C at existing restrooms. Ok to backfill progress area. Shading required
9/20/24: not ready
08/14/2024 COT - LCEL - Electrical Underground N/A Partial Pass 8/8/24: (1)1" for circuit HA-1 at north east entrance 50' stretch, (1)4" conduit for primary feeders from utility pole to future stub up of transformer, (1)2" for communication from utility pole to building 80', (2)3" for secondaries from future stub up at transformer to SES (100'), ok to backfill progress areas,
8/14/24: partial electrical underground for East/West trench, LB panel at concession building, panel LC under restroom building, trench across north parking lot,
08/08/2024 COT - LCPL - Sewer N/A Partial Pass 6/18/24: Pre con meeting
7/23/24: Canceled by Joel.
7/31/24: Sewer tie in passed, 4" partial pass from sewer tie in at north east corner of project to second clean-out on north east side of project. Ok to backfill progress areas. Shading required. Air test will be conducted at future inspection,
8/8/24: air test passed. Ok to proceed
10/15/2024 COT - LCBU - Building Progress N/A Partial Pass 10-15-24, first lift at 4' for concession stand and bathroom per approved plans. Okay to proceed.
10/23/2024 COT - LCEL - Grounding/Bonding N/A Partial Pass 10/23/24: reinforcement per plan at concession stand and bathrooms 2nd lift/ top out ok to proceed with grout.
10/23/2024 COT - LCBU - Preslab N/A Partial Pass 10/23/24: reinforcement per plan at concession stand and bathrooms 2nd lift/ top out ok to proceed with grout.
10/23/2024 COT - LCBU - Excavation/Rebar/Zoning N/A Partial Pass 10/23/24: reinforcement per plan at concession stand and bathrooms 2nd lift/ top out ok to proceed with grout.
12/23/2024 COT - LCBU - Masonry Pregrout N/A Partial Pass 10/23/24: reinforcement per plan at concession stand and bathrooms 2nd lift/ top out ok to proceed with grout.
12/23: reinforcement per plan at column north of bathrooms.

Completed Inspections

Permit Status: Issued
Permit Number: T22CM02977
Permit Description: Construction of 3 baseball fields, new restroom, walking paths & associated parking (DP submitted se
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/02/2024 COT - LCEL - Electrical Underground Passed
10/02/2024 COT - LCPL - Rough Soil Passed
10/02/2024 COT - LCPL - Yard Water Line Passed
10/02/2024 COT - LCPL - Sewer Passed

Documents

File Name Document Type  
CONS-3_PLAN SET_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW