Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
04/21/2022
Applicant:
Barry Kitay
Description:
Construction of a one-story 8,400 s.f. shell building.

Permit Reviews

Permit Number - T22CM02962
Permit Status: Complete
Permit Description: Construction of a one-story 8,400 s.f. shell building.
Start Date Submittal Complete Date Status  
04/21/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 08/02/2022 COMPLETED Review Details
08/02/2022 RESUBMITTAL 08/15/2022 COMPLETED Review Details
06/22/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/27/2023 APPROVED Review Details
08/02/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/07/2023 APPROVED Review Details
06/29/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/03/2023 APPROVED Review Details

Conditions

Permit Number - T22CM02962
Permit Status: Complete
Permit Description: Construction of a one-story 8,400 s.f. shell building.
Date Description Comments
08/13/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
08/13/2022 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
08/13/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
08/13/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
08/13/2022 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
08/13/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
08/13/2022 SPECIAL INSPECTION IS REQUIRED FOR WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION.
08/15/2022 Prior to permit issuance a General Contractor Letter (GCL) is required

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM02962
Permite Description: Construction of a one-story 8,400 s.f. shell building.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
10/13/2022 COT - LCPL - Rough Soil N/A Canceled {Activity date: 10/13/2022; Status: Not Applicable; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NA}
10/26/2022 COT - LCEL - Electrical Underground N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
07/27/2023 COT - BULD - SWG Clearance N/A Not Applicable
07/14/2023 COT - FCON - Fire - Final N/A Partial Pass Need FACP sign, FDC locking caps, Knox box with labeled keys and fence to be removed from perimeter of property.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM02962
Permit Description: Construction of a one-story 8,400 s.f. shell building.
Total Completed Inspections - 25
Date Description Inspector Results Comments
11/14/2022 COT - LCBU - Preslab Passed
12/20/2022 COT - LCPL - Plumbing Progress Passed
04/18/2023 COT - LCBU - Building Above Ceiling Passed 4/18/23: East half of building above ceiling approved to cover.
04/28/2023 COT - LCEL - Electrical Intermediate Passed
04/28/2023 COT - LCBU - Framing Passed
04/28/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
04/28/2023 COT - LCPL - Plumbing Roof Drains Passed
04/28/2023 COT - LCPL - Plumbing Intermediate Passed
04/28/2023 COT - LCBU - Exterior Clips/Sheathing Passed
04/28/2023 COT - LCBU - Roof Nailing Passed
04/28/2023 COT - LCBU - Building Progress Passed
04/28/2023 COT - LCPL - Sewer Passed
04/28/2023 COT - HCPL - Yard Water Line Passed
04/28/2023 COT - LCEL - Electrical Progress Passed
04/28/2023 COT - LCBU - Sustainability Passed
04/28/2023 COT - LCPL - Plumbing Final Passed
07/14/2023 COT - FCON - Alarm - Final Passed
07/20/2023 COT - LCEL - Electrical Final Passed
07/20/2023 COT - LCEL - Outdoor Lighting Passed
07/20/2023 COT - LCPL - Backwater Valve Passed
07/21/2023 COT - FCON - Sprinkler - Final Passed
07/27/2023 BULD - Electrical Clearance Passed
08/01/2023 ENGR Engineering Final Passed per DRoberts
08/03/2023 COT - FCON - Fire - Final Passed
08/03/2023 COT - LCBU - Building Final Passed 7/20/23: Waiting on Fire final and Engineering final.
8/3/23: OK to issue Letter of Completion.

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
CLOSE OUT LETTER PATTISON-2023-06-28_V1.PDF DOCUMENTS VIEW
WATER BAC T REPORT 2306-113 PHILLIP'S PLUMBING-2023-06-21_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
ENV COMP CERT.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
GENERAL CONTRACTOR LETTER.PDF DOCUMENTS VIEW
ENV COMP CERT.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW