Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM02936
Permit Details
Apply Date:
04/20/2022
Applicant:
Description:
R-Installation of a roof mounted 18.000kW PV System and a main panel upgrade to 225A
Permit Reviews
Permit Number - T22CM02936
Permit Status: Issued
Permit Description: R-Installation of a roof mounted 18.000kW PV System and a main panel upgrade to 225A
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/20/2022 | OTHER | 06/20/2022 | COMPLETED |
08/02/2022 | REVISION - - 1ST | 10/20/2022 | ACTIVE |
11/03/2022 | RESIDENTIAL SOLAR v.1 | 11/03/2022 | APPROVED |
Conditions
Permit Number - T22CM02936
Permit Status: Issued
Permit Description: R-Installation of a roof mounted 18.000kW PV System and a main panel upgrade to 225A
Date | Description | Comments |
---|---|---|
04/20/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM02936
Permite Description: R-Installation of a roof mounted 18.000kW PV System and a main panel upgrade to 225A
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM02936
Permit Description: R-Installation of a roof mounted 18.000kW PV System and a main panel upgrade to 225A
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/22/2022 | PDSD Building Division - TEP PMÂ Clearance | Passed | {Activity date: 08/22/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - CODE DGL} ; {Activity date: 08/22/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - CODE INCR/ POWERKILL} | |
11/08/2022 | RSBU - Building Final | Passed | ||
11/08/2022 | COT - RSEL - Electrical Final | Passed |