Permit: T22CM02924
Permit Details
Apply Date:
04/20/2022
Applicant:
Description:
SFR RICHT91719 T19-M0083
Conditions
Permit Number - T22CM02924
Permit Status: Issued
Permit Description: SFR RICHT91719 T19-M0083
Date | Description | Comments |
---|---|---|
04/20/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
04/20/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
04/20/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM02924
Permite Description: SFR RICHT91719 T19-M0083
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM02924
Permit Description: SFR RICHT91719 T19-M0083
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/16/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 05/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
05/16/2022 | COT - RSPL - Sewer | Passed | {Activity date: 05/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
05/16/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 05/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
06/09/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 06/09/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
06/10/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 06/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 06/09/2022; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - correction required, remove spoils and raise grounding electrode to ensure full encasement.} | |
06/10/2022 | COT - RSBU - Preslab | Passed | {Activity date: 06/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 06/09/2022; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - corrections required, Raise tendons where fallen off of chairs, compact locations that were disturbed. } |
|
06/10/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 06/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 06/09/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Ready} | |
07/01/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 07/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/07/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - approved} | |
10/07/2022 | RSME - Mechanical Progress | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - approved} | |
10/07/2022 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - approved} | |
10/11/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/07/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - Not ready. Staple any loose electrical cables.} | |
10/11/2022 | COT - LCBU - Framing | Passed | {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/07/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - Not ready. Add pins to loose bottom plates. Provide fire foam at all top penetrations} | |
10/11/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CODE ECO} | |
10/11/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/07/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - Not ready. Clips need to be nailed in master bedroom. Nail htc plates.} ; {Activity date: 07/01/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - Co 1 install 12 new anchor bolts as marked 2. Slider requires 3 king studs each end} |
|
10/11/2022 | COT - RSEL - Construction Power | Passed | {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP. TEP ECO} ; {Activity date: 10/07/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - Not ready. Secure grounding in panel box and at UFER.} | |
02/23/2023 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
03/15/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
03/15/2023 | COT - RSEL - Electrical Final | Passed | ||
03/15/2023 | COT - RSME - Mechanical Final | Passed | ||
04/04/2023 | RSBU - Building Final | Passed | 4/4/2023: all corrections made | |
04/04/2023 | COT - RSPL - Plumbing Final | Passed | 4/4/2023: all corrections made |