Permit: T22CM02915
Permit Details
Apply Date:
04/20/2022
Applicant:
Description:
SFR 135.2110 T21-M0052
Outstanding Activity Conditions
Permit Number - T22CM02915
Permit Status: Issued
Permit Description: SFR 135.2110 T21-M0052
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
04/20/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
04/20/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
04/20/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/20/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-059/P21WP00060, G-20-089/P21WP00061 AND THE DOWNSTREAM OFFSITE PUBLIC SEWER FORPARCEL 4 G-2020-087 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM02915
Permite Description: SFR 135.2110 T21-M0052
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/15/2022 | COT - RSEL - Construction Power | N/A | Not Ready | missing temporary receptacles. |
11/15/2022 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | provide DWV test. space pex lines 12” away from light fixtures. |
11/15/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | provide DWV test. space pex lines 12” away from light fixtures. fresh air intake duct needs to be minimum 10’ away from plumbing lines. |
02/27/2023 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM02915
Permit Description: SFR 135.2110 T21-M0052
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/01/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 07/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
07/01/2022 | COT - RSPL - Sewer | Passed | {Activity date: 07/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
07/01/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 07/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
07/12/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 07/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
07/12/2022 | COT - RSBU - Preslab | Passed | {Activity date: 07/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
07/12/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 07/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
07/12/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 07/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/18/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 08/18/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
08/18/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 08/18/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
11/15/2022 | COT - LCBU - Framing | Passed | ||
11/15/2022 | COT - RSPL - Gas Pressure Test | Passed | ||
11/18/2022 | COT - RSEL - Construction Power | Passed | ||
11/18/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
11/18/2022 | BULD - Electrical Clearance | Passed | ||
12/01/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | corrections were made | |
12/29/2022 | COT - HCBU - Interior Shear Bracing | Passed | ||
02/27/2023 | COT - BULD - SWG Clearance | Passed | clearance for Southwest Gas | |
03/17/2023 | COT - RSPL - Plumbing Final | Passed | ||
03/17/2023 | RSBU - Building Final | Passed | ||
03/17/2023 | COT - RSEL - Electrical Final | Passed | ||
03/17/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
03/17/2023 | RSME - Mechanical Progress | Passed | ||
03/17/2023 | COT - RSME - Mechanical Final | Passed |