Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
04/19/2022
Applicant:
Description:
SFR 130.1600 T21-M0030

Conditions

Permit Number - T22CM02893
Permit Status: Issued
Permit Description: SFR 130.1600 T21-M0030
Date Description Comments
04/19/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/19/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
04/19/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/19/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-100/P21WP00059, G-20-059/P20WP00060, G-20-089/P20WP00061 AND THE DOWNSTREAM OFFSITEPUBLIC SEWER FOR PARCEL 4 G-2020-087 IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM02893
Permite Description: SFR 130.1600 T21-M0030
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - HCBU - Interior Shear Bracing N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM02893
Permit Description: SFR 130.1600 T21-M0030
Total Completed Inspections - 22
Date Description Inspector Results Comments
06/09/2022 COT - RSPL - Yard Water Line Passed {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
06/09/2022 COT - RSPL - Sewer Passed {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
06/09/2022 COT - RSPL - Rough Soil Passed {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
06/20/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 06/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
06/20/2022 COT - RSBU - Preslab Passed {Activity date: 06/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
06/20/2022 COT - RSEL - Electrical Underground Passed {Activity date: 06/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
06/20/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 06/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
07/25/2022 COT - RSBU - Roof Nailing Passed {Activity date: 07/25/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
07/29/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 07/29/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 07/25/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE 1. Remove all nails from ladder blocking into top plate of shear walls. 2. Header at front door (4x8) required to extend to garage wall.}
09/22/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 09/22/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved}
09/22/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 09/22/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved}
09/22/2022 RSME - Mechanical Progress Passed {Activity date: 09/22/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved}
09/22/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 09/22/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved}
09/23/2022 COT - LCBU - Framing Passed {Activity date: 09/23/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/22/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready. Trim studs on doors cannot be used with osb plywood. Needs to be replaced with a 2x4 stud.}
09/23/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 09/23/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - CODE ECO}
09/23/2022 COT - RSEL - Construction Power Passed {Activity date: 09/23/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved. Clearance for TEP ECO.}
01/06/2023 COT - RSPL - Plumbing Final Passed
02/23/2023 BULD - Electrical Clearance Passed
02/23/2023 COT - RSEL - Outdoor Lighting Passed
02/23/2023 RSBU - Building Final Passed
02/23/2023 COT - RSEL - Electrical Final Passed
02/23/2023 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW