Permit: T22CM02885
Permit Details
Apply Date:
04/19/2022
Applicant:
Description:
SFR 230.2380 T21-M0028
Outstanding Activity Conditions
Permit Number - T22CM02885
Permit Status: Issued
Permit Description: SFR 230.2380 T21-M0028
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
04/19/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
04/19/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
04/19/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/19/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-100/P21WP00059, G-20-059/P20WP00060, G-20-089/P20WP00061 AND THE DOWNSTREAM OFFSITEPUBLIC SEWER FOR PARCEL 4 G-2020-087 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM02885
Permite Description: SFR 230.2380 T21-M0028
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM02885
Permit Description: SFR 230.2380 T21-M0028
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/27/2022 | COT - RSPL - Sewer | Passed | {Activity date: 05/27/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
05/27/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 05/27/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 05/20/2022; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - corrections required, clear debris and spoils from trenches, provide proper fill onsite prior to inspection. } |
|
06/14/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 06/14/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 05/27/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR} ; {Activity date: 05/20/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Ready} | |
06/15/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 06/15/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} | |
06/15/2022 | COT - RSBU - Preslab | Passed | {Activity date: 06/15/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} | |
06/15/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 06/15/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} | |
06/15/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 06/15/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/20/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Ready} | |
07/11/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 07/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
07/11/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 07/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/27/2022 | COT - LCBU - Framing | Passed | {Activity date: 09/27/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
09/27/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 09/27/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - CODE ECO} | |
09/27/2022 | COT - RSEL - Construction Power | Passed | {Activity date: 09/27/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved. Clearance for TEP ECO.} | |
09/27/2022 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 09/27/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
10/04/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 10/04/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/03/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Per previous notes.} ; {Activity date: 09/29/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready. Replace all duct that’s been filled with water.} ; {Activity date: 09/27/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Replace all duct that’s been filled with water. Exhaust fan needs to be completed. Register needs blocking.} | |
02/08/2023 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
04/19/2023 | COT - RSPL - Plumbing Final | Passed | All plumbing fixtures are installed and operational. | |
04/19/2023 | COT - RSEL - Electrical Final | Passed | All electrical outlets that require GFCI are on a GFCI breaker. | |
04/19/2023 | RSBU - Building Final | Passed | Construction is complete. Okay to issue C of O. | |
04/19/2023 | RSME - Mechanical Progress | Passed | ||
04/19/2023 | COT - RSEL - Outdoor Lighting | Passed | Porch lights are installed and operational. | |
04/19/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
04/19/2023 | COT - RSME - Mechanical Final | Passed | A/C unit is installed and operational. Registers are installed on ductwork. |