Permit Details

Status:
Complete
Type:
Commercial Building
Address:
1025 W PRINCE RD
Address NEW:
1025 W PRINCE RD
Apply Date:
04/19/2022
Applicant:
Description:
71.04kW DC Photovoltaic Solar Canopy Installation

Permit Reviews

Permit Number - T22CM02884
Permit Status: Complete
Permit Description: 71.04kW DC Photovoltaic Solar Canopy Installation
Start Date Submittal Complete Date Status  
04/19/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 05/19/2022 COMPLETED Review Details
05/24/2022 RESUBMITTAL 05/31/2022 COMPLETED Review Details
01/09/2023 COMMERCIAL PDSD SIMPLE REVIEW v.1 02/06/2023 APPROVED Review Details

Conditions

Permit Number - T22CM02884
Permit Status: Complete
Permit Description: 71.04kW DC Photovoltaic Solar Canopy Installation
Date Description Comments
05/03/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
05/03/2022 SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED.
05/03/2022 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
05/03/2022 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM02884
Permit Description: 71.04kW DC Photovoltaic Solar Canopy Installation
Total Completed Inspections - 11
Date Description Inspector Results Comments
11/29/2022 COT - LCBU - Excavation/Rebar/Zoning Passed approved column footings
11/29/2022 COT - LCBU - Preslab Passed approved column footings
11/29/2022 COT - LCEL - Grounding/Bonding Passed 12’ columns into grade
12/01/2022 COT - LCEL - Electrical Underground Passed Approved from gear rack to risers at solar structure, okay to backfill progress areas
12/13/2022 COT - LCBU - Framing Passed
12/13/2022 COT - LCBU - Building Progress Passed
12/13/2022 COT - LCEL - Electrical Intermediate Passed
12/16/2022 BULD - Electrical Clearance Passed Approved, DGC clearance to TEP is required
12/16/2022 COT - LCBU - Building Final Passed Solar structure
12/16/2022 COT - LCEL - Electrical Final Passed Approved, DGC clearance to TEP is required
12/19/2022 COT - LCEL - Outdoor Lighting Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GEO REPORT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CALCS.PDF DOCUMENTS VIEW
GEO REPORT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
T22CM02884 - COT FIRE STATION NO. 8 - SI CERTIFICATE-2023-01-04_V1.PDF DOCUMENTS VIEW
T22CM02884 - COT FIRE STATION NO. 8 - SI FINAL REPORT_V1.PDF DOCUMENTS VIEW