Permit: T22CM02822
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2121 N CRAYCROFT RD BLDG 6
Address NEW:
2121 N CRAYCROFT RD BLDG 6
Apply Date:
04/15/2022
Applicant:
Description:
TENANT IMPROVEMENT FOR MEDICAL BUILDING WITH SURGERY
Permit Reviews
Permit Number - T22CM02822
Permit Status: Complete
Permit Description: TENANT IMPROVEMENT FOR MEDICAL BUILDING WITH SURGERY
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/15/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 05/24/2022 | COMPLETED |
| 06/02/2022 | RESUBMITTAL | 06/16/2022 | COMPLETED |
| 07/06/2022 | RESUBMITTAL | 07/11/2022 | COMPLETED |
| 07/07/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/11/2023 | APPROVED |
Conditions
Permit Number - T22CM02822
Permit Status: Complete
Permit Description: TENANT IMPROVEMENT FOR MEDICAL BUILDING WITH SURGERY
| Date | Description | Comments |
|---|---|---|
| 07/08/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM02822
Permite Description: TENANT IMPROVEMENT FOR MEDICAL BUILDING WITH SURGERY
Total Outstanding Inspections - 12
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/27/2022 | COT - LCPL - Plumbing Intermediate | N/A | Partial Pass | East half. |
| 12/09/2022 | COT - LCBU - Framing | N/A | Partial Pass | Walls. |
| 01/17/2023 | COT - LCPL - Plumbing Progress | N/A | Partial Pass | Gas piping and condensation lines. |
| 01/17/2023 | COT - LCPL - Plumbing Above Ceiling | N/A | Partial Pass | Domestic water and DWV East of employee lockers. gas and condensation complete. |
| 04/18/2023 | COT - LCEL - Electrical Progress | N/A | Partial Pass | 4-18-23: In millwork wiring for East side nurses station. |
| 04/25/2023 | COT - LCEL - Electrical Above Ceiling | N/A | Partial Pass | 4-25-23: East of Fire wall. |
| 09/29/2023 | BULD - Electrical Clearance | N/A | Canceled | 9/29/23: cancel per Mark. |
| 06/27/2023 | COT - LCME - Mechanical Final | N/A | Partial Pass | 6-27-23: East of Fire wall. Clinic side. |
| COT - FCON - Sprinkler - Final | N/A | Not Ready | subs didnt call in their permits. | |
| 10/20/2023 | COT - FCON - Alarm - Final | N/A | Partial Pass | |
| 10/26/2023 | COT - FCON - Fire - Final | N/A | Partial Pass | Permits for compressed gas and flammable and combustible liquids shall be obtained. approved for TCO level 4 |
| 07/06/2023 | COT - LCBU - Building Final | N/A | Partial Pass | 7/6/23: Ok to issue Level 4 TCO for the clinical east side of the structure. The Surgical west side not ready for occupancy at this time. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM02822
Permit Description: TENANT IMPROVEMENT FOR MEDICAL BUILDING WITH SURGERY
Total Completed Inspections - 29
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2022 | COT - LCPL - Rough Soil | Passed | {Activity date: 06/09/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 06/08/2022; Status: Cancelled; Inspector: RCHANDLER; Comment: Entered by VVERA1 - CA per text from inspection supervisor.} | |
| 07/18/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - CODE TMPP} | |
| 11/30/2022 | COT - LCME - Mechanical Above Ceiling | Passed | ||
| 12/22/2022 | COT - LCPL - Medical Gas Preconstruction Mtg | Passed | ||
| 01/09/2023 | COT - LCPL - Plumbing Intermediate | Passed | Balance of East half Fromm lobby. | |
| 02/03/2023 | COT - LCBU - Framing | Passed | ||
| 02/06/2023 | COT - LCPL - Gas Pressure Test | Passed | OK to install new service; meter to be cleared n future. | |
| 02/17/2023 | COT - LCPL - Plumbing Progress | Passed | ||
| 03/22/2023 | COT - LCBU - Building Progress | Passed | 3-22-23: Fire wall. | |
| 04/05/2023 | COT - LCME - Mechanical Progress | Passed | ||
| 04/05/2023 | COT - LCBU - Building Above Ceiling | Passed | ||
| 04/05/2023 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 04/18/2023 | COT - LCEL - Electrical Intermediate | Passed | 4-18-23: Framing. | |
| 05/09/2023 | COT - LCPL - Medical Gas/Test | Passed | ||
| 05/24/2023 | COT - LCME - Mechanical Intermediate | Passed | ||
| 05/24/2023 | COT - LCEL - Electrical Progress | Passed | ||
| 07/19/2023 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 07/19/2023 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 07/21/2023 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 09/28/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 10/07/2023 | BULD - Electrical Clearance | Passed | ||
| 10/11/2023 | COT - LCPL - Plumbing Final | Passed | ||
| 10/13/2023 | COT - LCME - Mechanical Final | Passed | ||
| 10/13/2023 | COT - LCEL - Electrical Final | Passed | ||
| 10/20/2023 | COT - FCON - Sprinkler - Final | Passed | ||
| 10/26/2023 | COT - FCON - Alarm - Final | Passed | ||
| 10/26/2023 | COT - LCEL - Outdoor Lighting | Passed | ||
| 10/26/2023 | COT - LCBU - Preslab | Passed | ||
| 10/30/2023 | COT - LCBU - Building Final | Passed |