Permit: T22CM02817
Permit Details
Status:
In Review
Type:
Residential Building - One or Two Family
Address:
6614 E VILLA DORADO DR
Address NEW:
6614 E VILLA DORADO DR
Apply Date:
04/15/2022
Applicant:
Description:
- SYSTEM SIZE: 7140W DC, 5040W AC- MODULES: (21) JA SOLAR: JAM60S10-340/MR- INVERTERS: (21) ENPHAS
Permit Reviews
Permit Number - T22CM02817
Permit Status: In review
Permit Description: - SYSTEM SIZE: 7140W DC, 5040W AC- MODULES: (21) JA SOLAR: JAM60S10-340/MR- INVERTERS: (21) ENPHAS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/15/2022 | OTHER | 06/06/2022 | COMPLETED |
| 10/07/2022 | REVISION - - 1ST | 10/20/2022 | ACTIVE |
| 12/20/2022 | RESIDENTIAL SOLAR v.1 | 01/13/2023 | APPROVED |
| 01/13/2023 | RESIDENTIAL SOLAR v.1 | 01/13/2023 | APPROVED |
Conditions
Permit Number - T22CM02817
Permit Status: In review
Permit Description: - SYSTEM SIZE: 7140W DC, 5040W AC- MODULES: (21) JA SOLAR: JAM60S10-340/MR- INVERTERS: (21) ENPHAS
| Date | Description | Comments |
|---|---|---|
| 04/15/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: In Review
Permit Number: T22CM02817
Permite Description: - SYSTEM SIZE: 7140W DC, 5040W AC- MODULES: (21) JA SOLAR: JAM60S10-340/MR- INVERTERS: (21) ENPHAS
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSEL - Service Upgrade | N/A | Not Ready |
Completed Inspections
Permit Status: In Review
Permit Number: T22CM02817
Permit Description: - SYSTEM SIZE: 7140W DC, 5040W AC- MODULES: (21) JA SOLAR: JAM60S10-340/MR- INVERTERS: (21) ENPHAS
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/25/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
| 01/25/2023 | COT - RSEL - Electrical Final | Passed | ||
| 01/25/2023 | RSBU - Building Final | Passed | Solar |