Permit Details

Status:
Final
Type:
SOLAR WAIVER - RES
Apply Date:
04/15/2022
Applicant:
Sunrun Installation Services, Inc
Description:
- SYSTEM SIZE: 8690W DC, 6380W AC - MODULES: (22) LG ELECTRONICS: LG395Q1C-A6 - INVERTERS: (22) ENPHASE ENERGY: IQ7PLUS-72-2-US - RACKING: ; ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438
Architects:
  • Same as above
Contractors:
  • Sunrun Installation Services, Inc

Permit Reviews

Permit Number - T22CM02816
Permit Status: Final
Permit Description: - SYSTEM SIZE: 8690W DC, 6380W AC - MODULES: (22) LG ELECTRONICS: LG395Q1C-A6 - INVERTERS: (22) ENPHASE ENERGY: IQ7PLUS-72-2-US - RACKING: ; ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438
Start Date Submittal Complete Date Status  
04/15/2022 OTHER 06/06/2022 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T22CM02816
Permit Description: - SYSTEM SIZE: 8690W DC, 6380W AC - MODULES: (22) LG ELECTRONICS: LG395Q1C-A6 - INVERTERS: (22) ENPHASE ENERGY: IQ7PLUS-72-2-US - RACKING: ; ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438
Total Completed Inspections - 3
Date Description Inspector Results Comments
06/21/2022 TEP CLEARANCE - PM TGAUSP Approved CODE DGC
06/21/2022 ELECTRIC - FINAL TGAUSP Approved Approved, please send DGC Clearance to TEP
06/21/2022 BUILDING - FINAL TGAUSP Approved Approved, corrections addressed