Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM02787
Permit Details
Apply Date:
04/14/2022
Applicant:
burak bekat
Description:
SFR BRIOS1432 T20-M0059
Permit Reviews
Permit Number - T22CM02787
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/14/2022 | OTHER | 05/13/2022 | COMPLETED |
12/06/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/08/2023 | APPROVED |
Conditions
Permit Number - T22CM02787
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Date | Description | Comments |
---|---|---|
04/14/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
04/29/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
04/29/2022 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
04/29/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/29/2022 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
04/29/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
04/29/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
05/03/2022 | WATER METER SIZE |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM02787
Permite Description: SFR BRIOS1432 T20-M0059
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/22/2023 | COT - RSBU - Sustainability | N/A | Not Applicable | |
09/22/2023 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 9/22/23: Receptacle at dishwasher behind cabinet, exhaust fan at first floor bathroom in bedroom,disconnect stand needs to be sealed on roof |
09/22/2023 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 9/22/23: Receptacle at dishwasher behind cabinet, exhaust fan at first floor bathroom in bedroom,disconnect stand needs to be sealed on roof |
08/30/2023 | ENGR Engineering Final | N/A | Partial Pass | level one TC OF O. For stocking and plants splash pads, riprap need to be completed. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM02787
Permit Description: SFR BRIOS1432 T20-M0059
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/14/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 06/14/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
07/18/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
07/18/2022 | COT - RSBU - Preslab | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
07/18/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
08/09/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 08/09/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/08/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Inspection canceled by contractor } |
|
08/18/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 08/18/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - approved to bldg 38 east side} | |
10/20/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} | |
12/12/2022 | COT - LCBU - Framing | Passed | ||
12/14/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
12/14/2022 | RSME - Mechanical Progress | Passed | ||
12/14/2022 | RSEL - Electrical Progress | Passed | ||
02/07/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
02/09/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
08/02/2023 | BULD - Electrical Clearance | Passed | ||
09/22/2023 | COT - RSEL - Construction Power | Passed | ||
09/22/2023 | COT - RSPL - Sewer | Passed | ||
09/26/2023 | COT - RSEL - Electrical Final | Passed | ||
09/26/2023 | RSBU - Building Final | Passed | ||
11/27/2023 | ENGR Engineering Final | Passed |