Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
04/14/2022
Applicant:
burak bekat
Description:
SFR BRIOS1432 T20-M0059

Permit Reviews

Permit Number - T22CM02782
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Start Date Submittal Complete Date Status  
04/14/2022 OTHER 05/13/2022 COMPLETED Review Details
12/06/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/08/2023 APPROVED Review Details

Conditions

Permit Number - T22CM02782
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Date Description Comments
04/14/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/29/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
04/29/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
04/29/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/29/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
04/29/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/29/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
05/03/2022 WATER METER SIZE
01/21/2024 Post-Tension Inspection Report is required.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM02782
Permite Description: SFR BRIOS1432 T20-M0059
Total Outstanding Inspections - 18
Last Inspection Date Description Inspector Results Comments
12/29/2022 COT - RSBU - Masonry Pregrout N/A Not Applicable na
12/29/2022 COT - RSPL - Gas Pressure Test N/A Not Applicable na
12/29/2022 PDSD Building Division - Demo - Progress N/A Not Applicable na
12/29/2022 PDSD Building Division - Unspecified Third-Party N/A Not Applicable na
12/29/2022 COT - RSME - Hydronic Piping N/A Not Applicable
12/29/2022 COT - RSBU - Firewall/Fire Barrier/Firestop N/A Not Applicable an
12/29/2022 RSEL - Electrical Progress N/A Not Applicable
12/29/2022 PDSD Building Division - Unspecified In-Field N/A Not Applicable na
01/05/2023 Building Inspection - Outside Normal Hours Building Inspection N/A Not Applicable
10/26/2022 COT - RSEL - Electrical Underground N/A Not Ready
01/05/2023 COT - RSBU - Stem Wall/Retaining Wall N/A Not Applicable
01/05/2023 COT - RSPL - Backwater Valve N/A Not Applicable
01/05/2023 COT - RSPL - Gas Reconnect N/A Not Applicable
01/05/2023 COT - RSPL - Gas Final N/A Not Applicable
01/05/2023 COT - RSME - Mechanical Underground N/A Not Applicable nla
FCON – Fire – Intermediate N/A Not Ready
09/15/2023 COT - RSBU - Sustainability N/A Not Applicable
08/30/2023 ENGR Engineering Final N/A Partial Pass Roof drain splash pads and back ordered plants need to be completed prior to next inspection TC of O #1

Completed Inspections

Permit Status: Complete
Permit Number: T22CM02782
Permit Description: SFR BRIOS1432 T20-M0059
Total Completed Inspections - 30
Date Description Inspector Results Comments
10/20/2022 COT - RSPL - Yard Water Line Passed {Activity date: 10/20/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
12/05/2022 COT - LCBU - Framing Passed
12/29/2022 COT - RSBU - Preslab Passed
12/29/2022 COT - RSBU - Excavation/Rebar/Zoning Passed
12/29/2022 COT - RSEL - Grounding/Bonding Passed
12/29/2022 COT - RSPL - Rough Soil Passed
12/29/2022 COT - RSBU - Roof Nailing Passed
12/29/2022 PDSD Building Division - Unspecified Remote Video Passed
12/29/2022 COT - BULD - SWG Clearance Passed
12/29/2022 RSME - Mechanical Progress Passed
12/29/2022 COT - RSBU - Exterior Clips/Sheathing Passed
12/29/2022 COT - LCPL - Plumbing Intermediate Passed
01/05/2023 COT - HCBU - Interior Shear Bracing Passed
01/05/2023 COT - RSEL - Electrical Underground Passed
01/05/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/05/2023 RSBU - Building Progress Passed
01/05/2023 RSPL - Plumbing Progress Passed
01/11/2023 COT - RSBU - Interior Shear Bracing Passed
08/08/2023 BULD - Electrical Clearance Passed
09/15/2023 COT - RSPL - Sewer Passed
09/15/2023 COT - RSEL - Electrical Final Passed
09/15/2023 RSBU - Building Final Passed
09/15/2023 COT - RSPL - Plumbing Final Passed
09/26/2023 COT - RSEL - Outdoor Lighting Passed
09/26/2023 COT - RSME - Mechanical Final Passed
09/26/2023 COT - RSEL - Construction Power Passed
11/27/2023 PDSD Site/Engineering Division - Landscaping Passed
11/27/2023 COT - SITE - Zoning Intermediate Passed
11/27/2023 PDSD Site/Engineering Division - NPPO Passed
11/27/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
133394-1-2023-12-01_V1.PDF DOCUMENTS VIEW
CONS-BRIOSO_AT_THE_BRIDGES_MODEL_SFR_3BR_APPROVED_PLANS_V1.PDF DOCUMENTS VIEW