Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
04/14/2022
Applicant:
burak bekat
Description:
SFR BRIO1432 T20-M0058

Permit Reviews

Permit Number - T22CM02780
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Start Date Submittal Complete Date Status  
04/14/2022 OTHER 05/11/2022 COMPLETED Review Details
12/06/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/08/2023 APPROVED Review Details

Conditions

Permit Number - T22CM02780
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Date Description Comments
04/14/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/29/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
04/29/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
04/29/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/29/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
04/29/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/29/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
05/03/2022 WATER METER SIZE

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM02780
Permite Description: SFR BRIO1432 T20-M0058
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/21/2023 COT - RSBU - Sustainability N/A Not Applicable
08/30/2023 ENGR Engineering Final N/A Partial Pass level one TC OF O. For stocking and plants splash pads, riprap need to be completed.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM02780
Permit Description: SFR BRIO1432 T20-M0058
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/02/2022 COT - RSPL - Rough Soil Passed {Activity date: 06/02/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
07/05/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 07/05/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
07/05/2022 COT - RSBU - Preslab Passed {Activity date: 07/05/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
07/05/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 07/05/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
07/28/2022 COT - RSBU - Roof Nailing Passed {Activity date: 07/28/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 07/27/2022; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by VVERA1 - corrections required, provide ladder onsite and ready for further inspection.}
08/18/2022 COT - RSEL - Electrical Underground Passed {Activity date: 08/18/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - approved to bldg 38 east side

}
10/20/2022 COT - RSPL - Yard Water Line Passed {Activity date: 10/20/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
12/20/2022 RSEL - Electrical Progress Passed
12/20/2022 COT - LCBU - Framing Passed
12/20/2022 COT - LCPL - Plumbing Intermediate Passed
12/20/2022 RSME - Mechanical Progress Passed
01/27/2023 COT - RSBU - Exterior Clips/Sheathing Passed exterior clips and plywood installed
01/27/2023 COT - HCBU - Interior Shear Bracing Passed sheet rock is properly installed and screwed off. Okay to tape & texture walls.
08/02/2023 BULD - Electrical Clearance Passed
09/21/2023 COT - RSPL - Sewer Passed
09/21/2023 COT - RSEL - Construction Power Passed
09/21/2023 COT - RSEL - Electrical Final Passed
09/21/2023 RSBU - Building Final Passed
09/21/2023 COT - RSPL - Plumbing Final Passed
09/21/2023 COT - RSME - Mechanical Final Passed
11/27/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
133393-1-2023-12-01_V1.PDF DOCUMENTS VIEW
CONS-BRIOSO_AT_THE_BRIDGES_MODEL_SFR_2BR_APPROVED_PLANS_V1.PDF DOCUMENTS VIEW