Permit: T22CM02711
Permit Details
Apply Date:
04/13/2022
Applicant:
Ben Smith
Description:
SFR F40F22 T22-M0026
Outstanding Activity Conditions
Permit Number - T22CM02711
Permit Status: Issued
Permit Description: SFR F40F22 T22-M0026
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
04/13/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
04/13/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
04/13/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/13/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-052 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM02711
Permite Description: SFR F40F22 T22-M0026
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM02711
Permit Description: SFR F40F22 T22-M0026
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/09/2022 | COT - RSPL - Sewer | Passed | {Activity date: 05/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
05/09/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 05/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
05/16/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 05/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
05/16/2022 | COT - RSBU - Preslab | Passed | {Activity date: 05/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
05/16/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 05/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
05/16/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 05/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
07/07/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 07/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
07/08/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 07/07/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CO 1. Remove all loose truss bracing 2. Remove all nails from ladder blocking into the wall below, this gap to be shimmed and nailed AFTER the roof is loaded with tile} |
|
09/29/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CODE ECO} | |
09/29/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/29/2022 | COT - RSEL - Construction Power | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP. TEP ECO} | |
09/29/2022 | RSME - Mechanical Progress | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/29/2022 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/30/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 09/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP} ; {Activity date: 09/29/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE 1. Over-notch of non-bearing studs in the foyer & mud room 2. Post 2-ply girder at both ends 3. Sim mid bearing point of all trusses 4. Move furnace vent away from PVC vent 5. Repair lath at garage opening.} |
|
09/30/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP} ; {Activity date: 05/09/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR} | |
10/20/2022 | COT - LCBU - Framing | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/29/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE} | |
10/20/2022 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
02/03/2023 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
04/25/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
04/25/2023 | COT - RSME - Mechanical Final | Passed | ||
04/25/2023 | COT - RSEL - Electrical Final | Passed | ||
04/25/2023 | RSBU - Building Final | Passed | ||
04/25/2023 | COT - RSPL - Plumbing Final | Passed |