Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
04/13/2022
Applicant:
Ben Smith
Description:
SFR F40J22 T22-M0022

Permit Reviews

Permit Number - T22CM02710
Permit Status: Issued
Permit Description: SFR F40J22 T22-M0022
Start Date Submittal Complete Date Status  
04/13/2022 OTHER 05/17/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T22CM02710
Permit Status: Issued
Permit Description: SFR F40J22 T22-M0022
Total Outstanding Activity Conditions - 4
Date Name
04/13/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/13/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
04/13/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/13/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-052 IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM02710
Permite Description: SFR F40J22 T22-M0022
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
12/16/2022 FCON – OH Piping & Hydro N/A Not Applicable
12/16/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required maintain min 10 feet clearance from fresh air intake to vents
12/16/2022 COT - LCPL - Plumbing Intermediate N/A Re-inspection required leak in DWV system
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM02710
Permit Description: SFR F40J22 T22-M0022
Total Completed Inspections - 25
Date Description Inspector Results Comments
05/20/2022 COT - RSPL - Sewer Passed {Activity date: 05/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
05/23/2022 COT - RSPL - Yard Water Line Passed {Activity date: 05/23/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/20/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR}
05/23/2022 COT - RSPL - Rough Soil Passed {Activity date: 05/23/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/20/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CO
1. Remove all rocks/clods from trench
2. Support soil pipe with approved bedding material
Note. Water is full in all pipes}
06/02/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 06/02/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
06/02/2022 COT - RSBU - Preslab Passed {Activity date: 06/02/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
06/02/2022 COT - RSEL - Electrical Underground Passed {Activity date: 06/02/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
06/03/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 06/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 06/02/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval missing one front}
07/15/2022 COT - RSBU - Roof Nailing Passed {Activity date: 07/15/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 07/07/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR}
07/15/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 07/15/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 07/07/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR
Roof sheathing incomplete.}
12/16/2022 BULD - Electrical Clearance Passed TEP ECO
12/16/2022 COT - LCBU - Framing Passed
12/16/2022 COT - RSEL - Construction Power Passed
12/16/2022 COT - RSPL - Gas Pressure Test Passed
12/19/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/19/2022 COT - LCPL - Plumbing Intermediate Passed
04/10/2023 COT - BULD - SWG Clearance Passed SWG clearance required
04/10/2023 COT - RSPL - Plumbing Final Passed
04/24/2023 COT - RSME - Mechanical Final Passed
04/24/2023 COT - FCON - Sprinkler - Final Passed
04/24/2023 COT - RSEL - Outdoor Lighting Passed
04/24/2023 COT - FCON - Fire - Final Passed
04/25/2023 RSBU - Building Final Passed
04/25/2023 COT - RSEL - Electrical Final Passed
04/27/2023 RSME - Mechanical Progress Passed
04/27/2023 COT - HCBU - Interior Shear Bracing Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW