Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM02709
Permit Details
Apply Date:
04/13/2022
Applicant:
Andrea Flood
Description:
SFR STF40K T20-M0039
Outstanding Activity Conditions
Permit Number - T22CM02709
Permit Status: Issued
Permit Description: SFR STF40K T20-M0039
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
04/13/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
04/13/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
04/13/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/13/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-052 IS ACCEPTED AND RELEASED BY PCRWRD |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM02709
Permit Description: SFR STF40K T20-M0039
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/12/2022 | COT - RSPL - Sewer | Passed | {Activity date: 05/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
05/12/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 05/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
05/20/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 05/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
05/20/2022 | COT - RSBU - Preslab | Passed | {Activity date: 05/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
05/20/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 05/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
05/20/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 05/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
07/08/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
07/15/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 07/15/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 07/08/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CO 1. missing king stud at m bedroom window 2. Front porch requires two 2x6 header 3. Front porch column requires two 2x4 at both inside corners} |
|
11/16/2022 | COT - RSPL - Yard Water Line | Passed | ||
11/16/2022 | COT - RSEL - Construction Power | Passed | electric clearance required. TEP ECO | |
11/18/2022 | COT - RSPL - Gas Pressure Test | Passed | ||
11/18/2022 | COT - LCBU - Framing | Passed | ||
11/18/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/18/2022 | RSME - Mechanical Progress | Passed | ||
11/18/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
12/07/2022 | COT - HCBU - Interior Shear Bracing | Passed | ||
02/17/2023 | COT - BULD - SWG Clearance | Passed | SWG clearance required | |
02/17/2023 | COT - RSPL - Plumbing Final | Passed | ||
03/03/2023 | COT - RSME - Mechanical Final | Passed | ||
03/03/2023 | COT - RSEL - Electrical Final | Passed | ||
03/03/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
03/03/2023 | RSBU - Building Final | Passed |