Permit: T22CM02696
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
3551 E ELLINGTON PL
Address NEW:
3551 E ELLINGTON PL
Apply Date:
04/13/2022
Applicant:
Description:
Solar installation of a 2.800KW Roof-mounted solar panel system with 7 panels. PV Array area of: 151
Permit Reviews
Permit Number - T22CM02696
Permit Status: Issued
Permit Description: Solar installation of a 2.800KW Roof-mounted solar panel system with 7 panels. PV Array area of: 151
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/13/2022 | OTHER | 05/27/2022 | COMPLETED |
| 06/10/2022 | REVISION - - 1ST | 07/18/2022 | COMPLETED |
Conditions
Permit Number - T22CM02696
Permit Status: Issued
Permit Description: Solar installation of a 2.800KW Roof-mounted solar panel system with 7 panels. PV Array area of: 151
| Date | Description | Comments |
|---|---|---|
| 04/13/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM02696
Permite Description: Solar installation of a 2.800KW Roof-mounted solar panel system with 7 panels. PV Array area of: 151
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2022 | RSBU - Building Final | N/A | Partial Pass | MPU and rooftop panels, pending Electrical |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM02696
Permit Description: Solar installation of a 2.800KW Roof-mounted solar panel system with 7 panels. PV Array area of: 151
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2022 | COT - RSEL - Service Upgrade | Passed | Approved, INCR clearance to TEP is required | |
| 02/24/2023 | COT - RSEL - Electrical Final | Passed | ||
| 02/24/2023 | RSBU - Building Final | Passed | ||
| 02/24/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required |