Permit: T22CM02630
Permit Details
Apply Date:
04/12/2022
Applicant:
Sunrun Installation Services, Inc
Description:
- SYSTEM SIZE: 2720W DC, 3840W AC - MODULES: (8) JA SOLAR: JAM60S10-340/MR - INVERTERS: (1) DELTA ELECTRONICS: E4-TL-US - RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS STEEL HARDWARE - ENERGY STORAGE SYSTEM: (1) LG CHEM: RESU 10H PRIME, 9.8KWh, 5KW - MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN PANEL WITH 100 AMP MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER.
Architects:
- Same as above
Contractors:
- Sunrun Installation Services, Inc
Permit Reviews
Permit Number - T22CM02630
Permit Status: Final
Permit Description: - SYSTEM SIZE: 2720W DC, 3840W AC
- MODULES: (8) JA SOLAR: JAM60S10-340/MR
- INVERTERS: (1) DELTA ELECTRONICS: E4-TL-US
- RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS
STEEL HARDWARE
- ENERGY STORAGE SYSTEM: (1) LG CHEM: RESU 10H
PRIME, 9.8KWh, 5KW
- MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN
PANEL WITH 100 AMP MAIN BREAKER TO BE REPLACED
WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN
BREAKER.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/12/2022 | OTHER | 05/24/2022 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T22CM02630
Permit Description: - SYSTEM SIZE: 2720W DC, 3840W AC
- MODULES: (8) JA SOLAR: JAM60S10-340/MR
- INVERTERS: (1) DELTA ELECTRONICS: E4-TL-US
- RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS
STEEL HARDWARE
- ENERGY STORAGE SYSTEM: (1) LG CHEM: RESU 10H
PRIME, 9.8KWh, 5KW
- MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN
PANEL WITH 100 AMP MAIN BREAKER TO BE REPLACED
WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN
BREAKER.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/21/2022 | ELECTRIC - SERVICE UPGRADE | DQUINN | Approved | Ap Called TEP at 1 Clear incr Need solar for final |
| 06/30/2022 | TEP CLEARANCE - PM | DQUINN | Approved | CODE DGC/BATT |
| 06/30/2022 | ELECTRIC - FINAL | DQUINN | Approved | Ap Clear dgc and Batt |
| 06/30/2022 | BUILDING - FINAL | DQUINN | Approved | Ap |