Permit Details

Status:
Final
Type:
SOLAR WAIVER - RES
Address:
3127 N LAUREL AV
Address NEW:
3127 N LAUREL AV
Apply Date:
04/12/2022
Applicant:
Sunrun Installation Services, Inc
Description:
- SYSTEM SIZE: 2720W DC, 3840W AC - MODULES: (8) JA SOLAR: JAM60S10-340/MR - INVERTERS: (1) DELTA ELECTRONICS: E4-TL-US - RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS STEEL HARDWARE - ENERGY STORAGE SYSTEM: (1) LG CHEM: RESU 10H PRIME, 9.8KWh, 5KW - MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN PANEL WITH 100 AMP MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER.
Architects:
  • Same as above
Contractors:
  • Sunrun Installation Services, Inc

Permit Reviews

Permit Number - T22CM02630
Permit Status: Final
Permit Description: - SYSTEM SIZE: 2720W DC, 3840W AC - MODULES: (8) JA SOLAR: JAM60S10-340/MR - INVERTERS: (1) DELTA ELECTRONICS: E4-TL-US - RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS STEEL HARDWARE - ENERGY STORAGE SYSTEM: (1) LG CHEM: RESU 10H PRIME, 9.8KWh, 5KW - MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN PANEL WITH 100 AMP MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER.
Start Date Submittal Complete Date Status  
04/12/2022 OTHER 05/24/2022 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T22CM02630
Permit Description: - SYSTEM SIZE: 2720W DC, 3840W AC - MODULES: (8) JA SOLAR: JAM60S10-340/MR - INVERTERS: (1) DELTA ELECTRONICS: E4-TL-US - RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS STEEL HARDWARE - ENERGY STORAGE SYSTEM: (1) LG CHEM: RESU 10H PRIME, 9.8KWh, 5KW - MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN PANEL WITH 100 AMP MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER.
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/21/2022 ELECTRIC - SERVICE UPGRADE DQUINN Approved Ap
Called TEP at 1

Clear incr

Need solar for final
06/30/2022 TEP CLEARANCE - PM DQUINN Approved CODE DGC/BATT
06/30/2022 ELECTRIC - FINAL DQUINN Approved Ap

Clear dgc and Batt
06/30/2022 BUILDING - FINAL DQUINN Approved Ap

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SPEC SHEETS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SPEC SHEETS.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW