Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
04/06/2022
Applicant:
Description:
SFR 235.2960 T21-M0055

Permit Reviews

Permit Number - T22CM02546
Permit Status: Issued
Permit Description: SFR 235.2960 T21-M0055
Start Date Submittal Complete Date Status  
04/06/2022 OTHER 05/17/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T22CM02546
Permit Status: Issued
Permit Description: SFR 235.2960 T21-M0055
Total Outstanding Activity Conditions - 4
Date Name
04/06/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/06/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
04/06/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/06/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-101/P21WP00064 (LA ESTANCIA DE TUCSON - PHASE II - OFFSITE 4) IS ACCEPTED AND RELEASED BY PCRWRD AND NO FINAL UNTIL THE PUBLIC SEWER G-2020-090/P21WP0062 (LA ESTANCIA DE TUCSON - PHASE II - PARCEL 5) IS ACCEPTED AND RELEASED BYPCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM02546
Permite Description: SFR 235.2960 T21-M0055
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - LCBU - Framing N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM02546
Permit Description: SFR 235.2960 T21-M0055
Total Completed Inspections - 23
Date Description Inspector Results Comments
06/10/2022 COT - RSPL - Sewer Passed {Activity date: 06/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
06/10/2022 COT - RSPL - Rough Soil Passed {Activity date: 06/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
06/23/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 06/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
06/23/2022 COT - RSBU - Preslab Passed {Activity date: 06/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
06/23/2022 COT - RSEL - Electrical Underground Passed {Activity date: 06/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
06/23/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 06/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
07/18/2022 COT - RSBU - Roof Nailing Passed {Activity date: 07/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
07/18/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 07/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
10/06/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 10/06/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - CODE ECO}
10/06/2022 COT - RSEL - Construction Power Passed {Activity date: 10/06/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved. Clearance for TEP ECO.}
10/06/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 10/06/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved}
10/12/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 10/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} ; {Activity date: 10/06/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready. Staple electrical line above ceiling in master bathroom. Missing blocking at register in living room area. Receptacle in second floor bedroom needs to be secured. Provide DWV test throughout second floor.}
11/14/2022 COT - HCBU - Interior Shear Bracing Passed
11/15/2022 COT - LCBU - Framing Passed
11/15/2022 COT - LCPL - Plumbing Intermediate Passed
11/15/2022 COT - RSPL - Yard Water Line Passed
02/08/2023 COT - BULD - SWG Clearance Passed SWG for meter only
02/23/2023 COT - RSPL - Plumbing Final Passed
02/23/2023 RSME - Mechanical Progress Passed
02/23/2023 RSBU - Building Final Passed
02/23/2023 COT - RSEL - Electrical Final Passed
02/23/2023 COT - RSME - Mechanical Final Passed
02/23/2023 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW