Start Date Submittal Complete Date Status  
04/06/2022 OTHER 05/17/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T22CM02530
Permit Status: Issued
Permit Description: SFR 235.2960 T21-M0055
Total Outstanding Activity Conditions - 4
Date Name
04/06/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/06/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
04/06/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/06/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-101/P21WP00064 (LA ESTANCIA DE TUCSON - PHASE II - OFFSITE 4) IS ACCEPTED AND RELEASED BYPCRWRD AND NO FINAL UNTIL THE PUBLIC SEWER G-2020-090/P21WP0062 (LA ESTANCIA DETUCSON - PHASE II - PARCEL 5) IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM02530
Permite Description: SFR 235.2960 T21-M0055
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSPL - Yard Water Line N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM02530
Permit Description: SFR 235.2960 T21-M0055
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/13/2022 COT - RSPL - Sewer Passed {Activity date: 06/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
06/13/2022 COT - RSPL - Rough Soil Passed {Activity date: 06/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
06/23/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 06/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
06/23/2022 COT - RSBU - Preslab Passed {Activity date: 06/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
06/23/2022 COT - RSEL - Electrical Underground Passed {Activity date: 06/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
06/23/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 06/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
07/22/2022 COT - RSBU - Roof Nailing Passed {Activity date: 07/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
07/22/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 07/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
09/26/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 09/26/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - CODE ECO}
09/26/2022 COT - RSEL - Construction Power Passed {Activity date: 09/26/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved. Clearance for TEP ECO.
}
09/26/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 09/26/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
09/28/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 09/28/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 09/26/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready. Replace fresh air intake duct due to filled with water. Staple electrical line first floor exhaust fan along with bathroom underneath stairwell. Secure grounding on gas line.
}
09/28/2022 COT - LCBU - Framing Passed {Activity date: 09/28/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 09/26/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready. Provide stud shoe on vent lines for over notched studs}
11/07/2022 COT - LCPL - Plumbing Intermediate Passed
11/07/2022 COT - HCBU - Interior Shear Bracing Passed
02/23/2023 COT - RSPL - Plumbing Final Passed
02/23/2023 RSBU - Building Final Passed
02/23/2023 COT - RSEL - Electrical Final Passed
02/23/2023 COT - RSEL - Outdoor Lighting Passed
02/23/2023 RSME - Mechanical Progress Passed
02/23/2023 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW