Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM02467
Permit Details
Apply Date:
04/04/2022
Applicant:
burak bekat
Description:
SFR BRIO1432 T20-M0058
Permit Reviews
Permit Number - T22CM02467
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/04/2022 | OTHER | 04/08/2022 | COMPLETED |
12/06/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/22/2024 | APPROVED |
Conditions
Permit Number - T22CM02467
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Date | Description | Comments |
---|---|---|
04/04/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
04/08/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
04/08/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. | |
01/21/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/21/2024 | Post-Tension Inspection Report is required. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM02467
Permite Description: SFR BRIO1432 T20-M0058
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/12/2023 | COT - RSBU - Sustainability | N/A | Not Applicable | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
08/30/2023 | ENGR Engineering Final | N/A | Partial Pass | Roof drain splash pads and back ordered plants need to be completed prior to next inspection TC of O #1 |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM02467
Permit Description: SFR BRIO1432 T20-M0058
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/18/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 05/18/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} | |
05/26/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 05/26/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved} | |
06/20/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 06/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} | |
06/20/2022 | COT - RSBU - Preslab | Passed | {Activity date: 06/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} | |
06/20/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 06/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} | |
07/18/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
10/18/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to cover progress areas } |
|
11/22/2022 | RSME - Mechanical Progress | Passed | ||
11/22/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
11/22/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/22/2022 | COT - LCBU - Framing | Passed | ||
12/29/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/02/2023 | BULD - Electrical Clearance | Passed | ||
09/12/2023 | COT - RSEL - Construction Power | Passed | ||
09/12/2023 | COT - RSPL - Sewer | Passed | ||
09/12/2023 | COT - RSPL - Plumbing Final | Passed | ||
09/12/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
09/14/2023 | COT - RSME - Mechanical Final | Passed | 9/14/23: Level 4 TCO | |
09/14/2023 | RSBU - Building Final | Passed | 9/14/23: Level 4 TCO | |
09/14/2023 | COT - RSEL - Electrical Final | Passed | 9/14/23: Level 4 TCO | |
11/27/2023 | ENGR Engineering Final | Passed |