Permit: T22CM02465
Permit Details
Apply Date:
04/04/2022
Applicant:
burak bekat
Description:
SFR BRIOS1432 T20-M0059
Permit Reviews
Permit Number - T22CM02465
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/04/2022 | OTHER | 04/08/2022 | COMPLETED |
12/05/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/08/2023 | APPROVED |
Conditions
Permit Number - T22CM02465
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Date | Description | Comments |
---|---|---|
04/04/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
04/08/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
04/08/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. | |
12/08/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/21/2024 | Post-Tension Inspection Report is required. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM02465
Permite Description: SFR BRIOS1432 T20-M0059
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/30/2023 | COT - RSEL - Construction Power | N/A | Not Applicable | |
10/26/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Requested | |
10/26/2022 | COT - RSBU - Exterior Clips/Sheathing | N/A | Requested | |
11/02/2022 | COT - RSBU - Sustainability | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
08/30/2023 | ENGR Engineering Final | N/A | Partial Pass | okay for TCO level 4 STILL NEED SOME PLANTS AND SPLASH PADS ON BACK ORDER. |
09/06/2023 | RSBU - Building Final | N/A | Partial Pass | 9/6/23 need 3/4 knockout plug on water heater disco |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM02465
Permit Description: SFR BRIOS1432 T20-M0059
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/29/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 04/29/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} | |
05/19/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 05/19/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
06/07/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 06/07/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
06/07/2022 | COT - RSBU - Preslab | Passed | {Activity date: 06/07/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
06/07/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 06/07/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
07/05/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 07/05/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
01/26/2023 | COT - RSPL - Yard Water Line | Passed | approved for main and branch lines to units 20-25 | |
08/08/2023 | BULD - Electrical Clearance | Passed | ||
08/30/2023 | RSME - Mechanical Progress | Passed | ||
08/30/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
08/30/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/30/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
08/30/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/30/2023 | COT - RSPL - Sewer | Passed | ||
08/30/2023 | COT - LCBU - Framing | Passed | ||
08/30/2023 | COT - RSEL - Electrical Final | Passed | ||
08/31/2023 | COT - RSME - Mechanical Final | Passed | ||
08/31/2023 | COT - RSPL - Plumbing Final | Passed | ||
11/27/2023 | ENGR Engineering Final | Passed | ||
12/01/2023 | RSBU - Building Final | Passed | Ok for C OF O |