Permit: T22CM02409
Permit Details
Apply Date:
04/01/2022
Applicant:
Silverado Rooter and Plumbing
Description:
New yardline and hot and cold repipe Summary -obtain necessary permits -excavate ditch from water meter to back of house at bathrooms -install new Pex water service pipe from meter to house with tracer wire with copper service riser -install new type āLā copper pipe strapped to side of house and under eves from new service riser to water heater/ laundry shed -install new hot and cold water copper pipe to laundry -install new copper pipe to kitchen sink penetrating exterior wall behind kitchen sink -install new hot and cold water copper pipe penetrating exterior wall between bathrooms -remove tile and drywall as necessary in guest bathroom -transition to Pex pipe at interior partition wall between master and guest bathrooms Install new Pex piping serving water to 1 tub/shower valve, 1 master shower stall, 2 toilets, and 2 lavatories -leak test -call for necessary inspections -job site clean up
Contractors:
- Silverado Rooter and Plumbing
Completed Inspections
Permit Status: Final
Permit Number: T22CM02409
Permit Description: New yardline and hot and cold repipe
Summary -obtain necessary permits
-excavate ditch from water meter to back of house at bathrooms
-install new Pex water service pipe from meter to house with tracer wire with copper service riser
-install new type āLā copper pipe strapped to side of house and under eves from new service riser to water heater/ laundry shed
-install new hot and cold water copper pipe to laundry
-install new copper pipe to kitchen sink penetrating exterior wall behind kitchen sink
-install new hot and cold water copper pipe penetrating exterior wall between bathrooms
-remove tile and drywall as necessary in guest bathroom
-transition to Pex pipe at interior partition wall between master and guest bathrooms
Install new Pex piping serving water to 1 tub/shower valve, 1 master shower stall, 2 toilets, and 2 lavatories
-leak test
-call for necessary inspections
-job site clean up
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/06/2022 | PLUMBING - YARD WTR LINE/TEST | DQUINN | Approved | Ap Close permit |
| 04/06/2022 | PLUMBING - FINAL | DQUINN | Approved | Ap Close permit |
| 04/06/2022 | PLUMBING - INTERMEDIATE | DQUINN | Approved | Ap Close permit |