Permit Details

Status:
Final
Type:
SINGLE FAMILY OTHER
Address:
4258 E GLENN ST
Address NEW:
4258 E GLENN ST
Apply Date:
04/01/2022
Applicant:
Silverado Rooter and Plumbing
Description:
New yardline and hot and cold repipe Summary -obtain necessary permits -excavate ditch from water meter to back of house at bathrooms -install new Pex water service pipe from meter to house with tracer wire with copper service riser -install new type ā€œLā€ copper pipe strapped to side of house and under eves from new service riser to water heater/ laundry shed -install new hot and cold water copper pipe to laundry -install new copper pipe to kitchen sink penetrating exterior wall behind kitchen sink -install new hot and cold water copper pipe penetrating exterior wall between bathrooms -remove tile and drywall as necessary in guest bathroom -transition to Pex pipe at interior partition wall between master and guest bathrooms Install new Pex piping serving water to 1 tub/shower valve, 1 master shower stall, 2 toilets, and 2 lavatories -leak test -call for necessary inspections -job site clean up
Contractors:
  • Silverado Rooter and Plumbing

Completed Inspections

Permit Status: Final
Permit Number: T22CM02409
Permit Description: New yardline and hot and cold repipe Summary -obtain necessary permits -excavate ditch from water meter to back of house at bathrooms -install new Pex water service pipe from meter to house with tracer wire with copper service riser -install new type ā€œLā€ copper pipe strapped to side of house and under eves from new service riser to water heater/ laundry shed -install new hot and cold water copper pipe to laundry -install new copper pipe to kitchen sink penetrating exterior wall behind kitchen sink -install new hot and cold water copper pipe penetrating exterior wall between bathrooms -remove tile and drywall as necessary in guest bathroom -transition to Pex pipe at interior partition wall between master and guest bathrooms Install new Pex piping serving water to 1 tub/shower valve, 1 master shower stall, 2 toilets, and 2 lavatories -leak test -call for necessary inspections -job site clean up
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/06/2022 PLUMBING - YARD WTR LINE/TEST DQUINN Approved Ap

Close permit
04/06/2022 PLUMBING - FINAL DQUINN Approved Ap

Close permit
04/06/2022 PLUMBING - INTERMEDIATE DQUINN Approved Ap

Close permit

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW