Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
03/31/2022
Applicant:
Description:
Site water line, site sewer line

Permit Reviews

Permit Number - T22CM02364
Permit Status: Issued
Permit Description: Site water line, site sewer line
Start Date Submittal Complete Date Status  
03/31/2022 OTHER 04/26/2022 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM02364
Permite Description: Site water line, site sewer line
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
10/26/2022 COT - LCPL - Backwater Valve N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM02364
Permit Description: Site water line, site sewer line
Total Completed Inspections - 2
Date Description Inspector Results Comments
06/20/2022 COT - LCPL - Yard Water Line Passed {Activity date: 06/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved for lot 20, 2” PVC connected at existing stub-out from meter to the building, okay to backfill progress areas}
06/20/2022 COT - LCPL - Sewer Passed {Activity date: 06/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved for lot 20, connected to existing 6”main, okay to backfill progress areas}

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW