Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/31/2022
Applicant:
Description:
Interior remodel of a single existing residential unit and change in occupancy type from R-2 residen

Permit Reviews

Permit Number - T22CM02349
Permit Status: Complete
Permit Description: Interior remodel of a single existing residential unit and change in occupancy type from R-2 residen
Start Date Submittal Complete Date Status  
03/31/2022 COMMERCIAL - TI 04/26/2022 COMPLETED Review Details
05/21/2022 RESUBMITTAL 06/16/2022 COMPLETED Review Details

Conditions

Permit Number - T22CM02349
Permit Status: Complete
Permit Description: Interior remodel of a single existing residential unit and change in occupancy type from R-2 residen
Date Description Comments
08/26/2022 General Contractor Letter required

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM02349
Permite Description: Interior remodel of a single existing residential unit and change in occupancy type from R-2 residen
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/12/2022 COT - LCPL - Plumbing Final N/A Re-inspection required need open front toilet seat.
12/12/2022 COT - LCBU - CofO N/A Re-inspection required Need Plumbing Final inspection approval.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM02349
Permit Description: Interior remodel of a single existing residential unit and change in occupancy type from R-2 residen
Total Completed Inspections - 17
Date Description Inspector Results Comments
09/27/2022 COT - LCEL - Electrical Underground Passed {Activity date: 09/27/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP
NOTE: INSTALL ONLY 1/2" CEILING ROCK AT EACH LAYER}
09/29/2022 COT - LCBU - Framing Passed {Activity date: 09/29/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/27/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE
1. Install four stud shoes
2. Install paddy pads on ceiling J-boxes
3. Ground all elect boxes
4. Remove j-box from above ceiling on west wall} ; {Activity date: 08/31/2022; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by VVERA1 - NR. Precon meeting.} ; {Activity date: 08/30/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Denied: No access for inspection 8:04 AM.}
10/11/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 10/11/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
10/11/2022 COT - LCBU - Firewall/Fire Barrier/Firestop Passed {Activity date: 10/11/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
10/11/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 10/11/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
11/22/2022 COT - LCBU - Building Progress Passed
11/22/2022 COT - LCME - Mechanical Intermediate Passed
11/22/2022 COT - LCEL - Electrical Above Ceiling Passed
11/22/2022 COT - LCPL - Rough Soil Passed
12/07/2022 COT - LCME - Mechanical Final Passed
12/07/2022 COT - FCON - Fire - Final Passed
12/07/2022 COT - LCBU - Building Above Ceiling Passed
12/12/2022 COT - LCEL - Electrical Final Passed
12/12/2022 COT - LCBU - Building Final Passed
12/20/2022 COT - HCPL - Plumbing Final Passed
12/20/2022 COT - HCBU - CofO Passed
12/20/2022 COT - HCPL - Rough Soil Passed