Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
03/30/2022
Applicant:
ramon polanco
Description:
SFR BRIO1432 T20-M0058

Permit Reviews

Permit Number - T22CM02315
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Start Date Submittal Complete Date Status  
03/30/2022 OTHER 04/04/2022 COMPLETED Review Details
12/05/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/08/2023 APPROVED Review Details

Conditions

Permit Number - T22CM02315
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Date Description Comments
03/30/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/05/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
04/05/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
04/05/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/05/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
04/05/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/05/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM02315
Permite Description: SFR BRIO1432 T20-M0058
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready
08/29/2023 COT - RSEL - Construction Power N/A Not Applicable
10/26/2022 COT - RSEL - Electrical Underground N/A Not Ready
08/29/2023 COT - RSPL - Plumbing Final N/A Re-inspection required 8/29/23: shower must be properly sealed around edges, panel schedule needs to be verified, stack vent needs to properly terminate above roof jack.
08/29/2023 COT - RSME - Mechanical Final N/A Re-inspection required 8/29/23: Ac unit requires 45Amp fuses
08/29/2023 COT - RSEL - Electrical Final N/A Re-inspection required 8/29/23: shower must be properly sealed around edges, panel schedule needs to be verified, stack vent needs to properly terminate above roof jack.
08/30/2023 ENGR Engineering Final N/A Partial Pass Roof drain splash pads and back ordered plants need to be completed prior to next inspection okay for TCO level 4
09/06/2023 RSBU - Building Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM02315
Permit Description: SFR BRIO1432 T20-M0058
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/07/2022 COT - RSPL - Rough Soil Passed {Activity date: 04/07/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
05/19/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 05/19/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
05/19/2022 COT - RSBU - Preslab Passed {Activity date: 05/19/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
05/19/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 05/19/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
06/13/2022 COT - RSBU - Roof Nailing Passed {Activity date: 06/13/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
10/12/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 10/12/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
10/12/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 10/12/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
10/12/2022 COT - RSBU - Sustainability Passed {Activity date: 10/12/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
12/12/2022 COT - HCBU - Interior Shear Bracing Passed
07/12/2023 BULD - Electrical Clearance Passed
08/29/2023 RSME - Mechanical Progress Passed
08/29/2023 COT - RSPL - Sewer Passed
08/29/2023 COT - LCPL - Plumbing Intermediate Passed
08/29/2023 COT - LCBU - Framing Passed
08/29/2023 COT - RSPL - Yard Water Line Passed
08/29/2023 COT - RSEL - Electrical Underground Passed
08/31/2023 COT - RSPL - Plumbing Final Passed
08/31/2023 COT - RSME - Mechanical Final Passed
09/01/2023 COT - RSEL - Electrical Final Passed
11/27/2023 ENGR Engineering Final Passed
12/01/2023 RSBU - Building Final Passed Ok for C OF O

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
132157-1-2023-12-01_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
APPLICATON.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
UTILITY PLAN.PDF DOCUMENTS VIEW