Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM02290
Permit Details
Apply Date:
03/30/2022
Applicant:
Rosebelle Ann Sanoria
Description:
Installation of 11.20KW PV System/Derate to 175A
Permit Reviews
Permit Number - T22CM02290
Permit Status: In revision
Permit Description: Installation of 11.20KW PV System/Derate to 175A
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/30/2022 | OTHER | 05/16/2022 | COMPLETED |
09/30/2022 | REVISION - - 1ST | 10/20/2022 | ACTIVE |
11/15/2022 | RESIDENTIAL SOLAR v.1 | 11/15/2022 | APPROVED |
Conditions
Permit Number - T22CM02290
Permit Status: In revision
Permit Description: Installation of 11.20KW PV System/Derate to 175A
Date | Description | Comments |
---|---|---|
03/30/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: In Revision
Permit Number: T22CM02290
Permite Description: Installation of 11.20KW PV System/Derate to 175A
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/13/2023 | BULD - Electrical Clearance | N/A | Partial Pass | partialled for future use with solar clearance |
10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready | |
10/27/2022 | RSBU - Building Final | N/A | Not Ready |
Completed Inspections
Permit Status: In Revision
Permit Number: T22CM02290
Permit Description: Installation of 11.20KW PV System/Derate to 175A
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/24/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
01/24/2023 | COT - RSEL - Electrical Final | Passed | ||
01/24/2023 | RSBU - Building Final | Passed | solar |