Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
03/29/2022
Applicant:
Description:
SFR RICHT91919 T19-M0086

Outstanding Activity Conditions

Permit Number - T22CM02223
Permit Status: Issued
Permit Description: SFR RICHT91919 T19-M0086
Total Outstanding Activity Conditions - 3
Date Name
03/29/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
03/29/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
03/29/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Completed Inspections

Permit Status: Issued
Permit Number: T22CM02223
Permit Description: SFR RICHT91919 T19-M0086
Total Completed Inspections - 23
Date Description Inspector Results Comments
04/19/2022 COT - RSPL - Yard Water Line Passed {Activity date: 04/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
04/19/2022 COT - RSPL - Sewer Passed {Activity date: 04/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
04/20/2022 COT - RSPL - Rough Soil Passed {Activity date: 04/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 04/19/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CO
Remove all clods from trench, water test low}
05/03/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 05/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 05/02/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CO}
05/03/2022 COT - RSBU - Preslab Passed {Activity date: 05/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 05/02/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CO
1. Install property line string line.
2. Reinforcing laying in dirt
3. Ufer laying in dirt}
05/03/2022 COT - RSEL - Electrical Underground Passed {Activity date: 05/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 05/02/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CO}
05/03/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 05/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 05/02/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CO}
05/13/2022 COT - RSBU - Roof Nailing Passed {Activity date: 05/13/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
05/13/2022 COT - LCBU - Framing Passed {Activity date: 05/13/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
05/13/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 05/13/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
09/16/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 09/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CODE ECO}
09/16/2022 COT - RSEL - Construction Power Passed {Activity date: 09/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP. TEP ECO}
09/16/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 09/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
09/30/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 09/30/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/26/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready. Gas line needs to be re bonded.
} ; {Activity date: 09/16/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE}
10/05/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 10/05/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} ; {Activity date: 10/04/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR} ; {Activity date: 09/30/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Provide blocking at register.} ; {Activity date: 09/26/2022; Status: Denied; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - denied. Per previous notes.} ; {Activity date: 09/16/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE
1. Seal penetrations in the lath
2. 2 letins in a roe max
3. Nail plate ABS
4. Romex incomplete thruout
5. Move two smoke det more than 3 feet from bathroom door
6. Replace fresh air intake duct}
10/05/2022 RSME - Mechanical Progress Passed {Activity date: 10/05/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} ; {Activity date: 10/04/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR} ; {Activity date: 09/30/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Provide blocking at register.} ; {Activity date: 09/26/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready. Support duct work. Provide blocking at register.

} ; {Activity date: 09/16/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE}
10/07/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 10/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - approved}
02/16/2023 COT - BULD - SWG Clearance Passed SWG for meter only
02/17/2023 COT - RSEL - Outdoor Lighting Passed
02/17/2023 COT - RSME - Mechanical Final Passed
02/23/2023 COT - RSPL - Plumbing Final Passed
02/23/2023 RSBU - Building Final Passed
02/23/2023 COT - RSEL - Electrical Final Passed