Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
03/21/2022
Applicant:
burak bekat
Description:
SFR BRIOS1432 T20-M0059 Bldg 4

Permit Reviews

Permit Number - T22CM02056
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059 Bldg 4
Start Date Submittal Complete Date Status  
03/21/2022 OTHER 04/04/2022 COMPLETED Review Details
12/05/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/07/2023 APPROVED Review Details

Conditions

Permit Number - T22CM02056
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059 Bldg 4
Date Description Comments
03/21/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
03/22/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
03/22/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
03/22/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/22/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
03/22/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/22/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM02056
Permite Description: SFR BRIOS1432 T20-M0059 Bldg 4
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSPL - Yard Water Line N/A Not Ready
08/16/2023 COT - RSEL - Construction Power N/A Not Applicable
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/04/2023 ENGR Engineering Final N/A Partial Pass OK FOUR LEVEL FOUR 2-49 the entrance of the project need to be redone the handicap parking need to be redone the catch basin need to be look at by surveyors it looks like bust.the roof drain need to be lowered,the trash roll-off need to be removed.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM02056
Permit Description: SFR BRIOS1432 T20-M0059 Bldg 4
Total Completed Inspections - 20
Date Description Inspector Results Comments
04/07/2022 COT - RSPL - Rough Soil Passed {Activity date: 04/07/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
04/26/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 04/26/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
04/26/2022 COT - RSBU - Preslab Passed {Activity date: 04/26/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
04/26/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 04/26/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
05/04/2022 COT - RSEL - Electrical Underground Passed {Activity date: 05/04/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved secondary and communication raceways installed and ok to backfill.}
05/31/2022 COT - RSBU - Roof Nailing Passed {Activity date: 05/31/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
09/16/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 09/16/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to insulate and cover walls.}
09/16/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 09/16/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
09/16/2022 COT - RSBU - Sustainability Passed {Activity date: 09/16/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
10/04/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 10/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to tape throughout.}
07/21/2023 BULD - Electrical Clearance Passed
08/16/2023 COT - LCBU - Framing Passed
08/16/2023 COT - RSEL - Electrical Final Passed
08/16/2023 COT - LCPL - Plumbing Intermediate Passed
08/24/2023 COT - RSPL - Sewer Passed
08/24/2023 RSME - Mechanical Progress Passed
08/25/2023 COT - RSPL - Plumbing Final Passed
08/29/2023 COT - RSME - Mechanical Final Passed
08/29/2023 RSBU - Building Final Passed
11/27/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
131560-1-2023-12-01_V1.PDF DOCUMENTS VIEW
CONS-BRIOSO_AT_THE_BRIDGES_MODEL_SFR_3BR_APPROVED_PLANS_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
INSPECTION CARD.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
UTILITY PLAN.PDF CONSTRPLANS VIEW