Permit: T22CM02056
Permit Details
Apply Date:
03/21/2022
Applicant:
ramon polanco
Description:
SFR BRIOS1432 T20-M0059 Bldg 4
Permit Reviews
Permit Number - T22CM02056
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059 Bldg 4
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/21/2022 | OTHER | 04/04/2022 | COMPLETED |
12/05/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/07/2023 | APPROVED |
Conditions
Permit Number - T22CM02056
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059 Bldg 4
Date | Description | Comments |
---|---|---|
03/21/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
03/22/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
03/22/2022 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
03/22/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/22/2022 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
03/22/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/22/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM02056
Permite Description: SFR BRIOS1432 T20-M0059 Bldg 4
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSPL - Yard Water Line | N/A | Not Ready | |
08/16/2023 | COT - RSEL - Construction Power | N/A | Not Applicable | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
10/26/2022 | COT - FCON - Fire - Final | N/A | Not Ready | |
10/04/2023 | ENGR Engineering Final | N/A | Partial Pass | OK FOUR LEVEL FOUR 2-49 the entrance of the project need to be redone the handicap parking need to be redone the catch basin need to be look at by surveyors it looks like bust.the roof drain need to be lowered,the trash roll-off need to be removed. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM02056
Permit Description: SFR BRIOS1432 T20-M0059 Bldg 4
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/07/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 04/07/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
04/26/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 04/26/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
04/26/2022 | COT - RSBU - Preslab | Passed | {Activity date: 04/26/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
04/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 04/26/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
05/04/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 05/04/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved secondary and communication raceways installed and ok to backfill.} | |
05/31/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 05/31/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
09/16/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 09/16/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to insulate and cover walls.} | |
09/16/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 09/16/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} | |
09/16/2022 | COT - RSBU - Sustainability | Passed | {Activity date: 09/16/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} | |
10/04/2022 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 10/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to tape throughout.} | |
07/21/2023 | BULD - Electrical Clearance | Passed | ||
08/16/2023 | COT - LCBU - Framing | Passed | ||
08/16/2023 | COT - RSEL - Electrical Final | Passed | ||
08/16/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
08/24/2023 | COT - RSPL - Sewer | Passed | ||
08/24/2023 | RSME - Mechanical Progress | Passed | ||
08/25/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/29/2023 | COT - RSME - Mechanical Final | Passed | ||
08/29/2023 | RSBU - Building Final | Passed | ||
11/27/2023 | ENGR Engineering Final | Passed |