Permit: T22CM02019
Permit Details
Status:
Final
Type:
SOLAR WAIVER - RES
Address:
7340 E ALDERBERRY ST
Address NEW:
7340 E ALDERBERRY ST
Apply Date:
03/18/2022
Applicant:
Sunrun Installation Services, Inc
Description:
- SYSTEM SIZE: 12920W DC, 9600W AC - MODULES: (38) JA SOLAR: JAM60S10-340/MR - INVERTERS: (1) DELTA ELECTRONICS: E6-TL-US, (1) DELTA ELECTRONICS: E4-TL-US - RACKING: ; ADJUSTABLE TILE HOOK, SEE DRAWING SNR-DC-00437 - MAIN BREAKER DERATE: REPLACE EXISTING 200 AMP MAIN BREAKER WITH NEW 175 AMP 22K AIC RATED MAIN BREAKER. - RAPID SHUTDOWN: (38) APSMART RSD-S-PLC ROOFTOP MODULE LEVEL RAPID SHUTDOWN DEVICE
Architects:
- Same As Above
Contractors:
- Sunrun Installation Services, Inc
Permit Reviews
Permit Number - T22CM02019
Permit Status: Final
Permit Description: - SYSTEM SIZE: 12920W DC, 9600W AC
- MODULES: (38) JA SOLAR: JAM60S10-340/MR
- INVERTERS: (1) DELTA ELECTRONICS: E6-TL-US, (1) DELTA
ELECTRONICS: E4-TL-US
- RACKING: ; ADJUSTABLE TILE HOOK, SEE DRAWING
SNR-DC-00437
- MAIN BREAKER DERATE: REPLACE EXISTING 200 AMP MAIN
BREAKER WITH NEW 175 AMP 22K AIC RATED MAIN
BREAKER.
- RAPID SHUTDOWN: (38) APSMART RSD-S-PLC ROOFTOP
MODULE LEVEL RAPID SHUTDOWN DEVICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/18/2022 | OTHER | 05/06/2022 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T22CM02019
Permit Description: - SYSTEM SIZE: 12920W DC, 9600W AC
- MODULES: (38) JA SOLAR: JAM60S10-340/MR
- INVERTERS: (1) DELTA ELECTRONICS: E6-TL-US, (1) DELTA
ELECTRONICS: E4-TL-US
- RACKING: ; ADJUSTABLE TILE HOOK, SEE DRAWING
SNR-DC-00437
- MAIN BREAKER DERATE: REPLACE EXISTING 200 AMP MAIN
BREAKER WITH NEW 175 AMP 22K AIC RATED MAIN
BREAKER.
- RAPID SHUTDOWN: (38) APSMART RSD-S-PLC ROOFTOP
MODULE LEVEL RAPID SHUTDOWN DEVICE
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2022 | TEP CLEARANCE - PM | DQUINN | Approved | CODE DGC |
| 07/08/2022 | BUILDING - FINAL | DQUINN | Approved | Ap |
| 07/08/2022 | ELECTRIC - FINAL | DQUINN | Approved | Ap Clear dgc Close permit |