Permit: T22CM01934
Permit Details
Apply Date:
03/16/2022
Applicant:
Technicians for Sustainability
Description:
roof mount 3.3 kW DC addition to existing photovoltaic solar system (new total system size: 6.51 kW), 9 additional modules, 1 additional branch circuit, PV subpanel, 40A PV breaker on 200A bus with 200A MCB
Contractors:
- Technicians for Sustainability
Permit Reviews
Permit Number - T22CM01934
Permit Status: Final
Permit Description: roof mount 3.3 kW DC addition to existing photovoltaic solar system (new total system size: 6.51 kW), 9 additional modules, 1 additional branch circuit, PV subpanel, 40A PV breaker on 200A bus with 200A MCB
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/16/2022 | OTHER | 05/05/2022 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T22CM01934
Permit Description: roof mount 3.3 kW DC addition to existing photovoltaic solar system (new total system size: 6.51 kW), 9 additional modules, 1 additional branch circuit, PV subpanel, 40A PV breaker on 200A bus with 200A MCB
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/28/2022 | TEP CLEARANCE - PM | DQUINN | Approved | CODE DGC |
| 07/28/2022 | ELECTRIC - FINAL | DQUINN | Approved | Ap Clear dgc |
| 07/28/2022 | BUILDING - FINAL | DQUINN | Approved | Ap |