Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SINGLE FAMILY OTHER
Address:
4342 E 6TH ST
Address NEW:
4342 E 6TH ST
Apply Date:
03/16/2022
Applicant:
Silverado Rooter and Plumbing
Description:
New gas line for pool heater Summary Permits and inspection Half down before work can start . Run about 60-80 feet of gas line . Hand dig from gas meter in the alley under wall to pool equipment location. Dig down 18-24 inches deep . Add polybutylene gas line and tracer wire in ground. Call in for inspection Back fill to a rough finish. Leave pipe under air pressure for testing . Leave supply line on riser at pool equipment location. Costumer responsible for new meter form the city . Leave riser next to gas meter with ball valve and gauge set for 15 psi
Contractors:
  • Silverado Rooter and Plumbing

Permit Reviews

Permit Number - T22CM01914
Permit Status: Final
Permit Description: New gas line for pool heater Summary Permits and inspection Half down before work can start . Run about 60-80 feet of gas line . Hand dig from gas meter in the alley under wall to pool equipment location. Dig down 18-24 inches deep . Add polybutylene gas line and tracer wire in ground. Call in for inspection Back fill to a rough finish. Leave pipe under air pressure for testing . Leave supply line on riser at pool equipment location. Costumer responsible for new meter form the city . Leave riser next to gas meter with ball valve and gauge set for 15 psi
Start Date Submittal Complete Date Status  
03/16/2022 OTHER 03/16/2022 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T22CM01914
Permit Description: New gas line for pool heater Summary Permits and inspection Half down before work can start . Run about 60-80 feet of gas line . Hand dig from gas meter in the alley under wall to pool equipment location. Dig down 18-24 inches deep . Add polybutylene gas line and tracer wire in ground. Call in for inspection Back fill to a rough finish. Leave pipe under air pressure for testing . Leave supply line on riser at pool equipment location. Costumer responsible for new meter form the city . Leave riser next to gas meter with ball valve and gauge set for 15 psi
Total Completed Inspections - 3
Date Description Inspector Results Comments
03/22/2022 GAS CLEARANCE ESTEVENS Approved CODE
03/22/2022 PLUMBING - FINAL ESTEVENS Approved Approved. Southwest gas clearance is required, Meg need to upsize meter.
03/22/2022 PLUMBING - GAS PRESSURE TEST ESTEVENS Approved Approved. Southwest gas clearance is required, Meg need to upsize meter.

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GAS TEMPLATE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GAS TEMPLATE.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW