Permit: T22CM01805
Permit Details
Apply Date:
03/11/2022
Applicant:
Ben Smith
Description:
SFR F40G19 T19-M0038
Outstanding Activity Conditions
Permit Number - T22CM01805
Permit Status: Issued
Permit Description: SFR F40G19 T19-M0038
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
03/11/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
03/11/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
03/11/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
03/11/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
03/11/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-052 ISACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM01805
Permite Description: SFR F40G19 T19-M0038
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/24/2022 | COT - LCBU - Framing | N/A | Re-inspection required | DE 1080. RESIDENTIAL INTERMEDIATE. DE 1. Install AB within 12” of ends of OSB shear walls 2. Install stud shoe at bearing wall stud over notch in flex room. 3. Move hallway SD 3feet from bathroom door |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM01805
Permit Description: SFR F40G19 T19-M0038
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/19/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 04/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
04/19/2022 | COT - RSPL - Sewer | Passed | {Activity date: 04/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
04/19/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 04/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
05/02/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 05/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
05/02/2022 | COT - RSBU - Preslab | Passed | {Activity date: 05/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
05/02/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 05/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
05/02/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 05/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
06/16/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 06/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 06/13/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready } |
|
06/16/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 06/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 06/13/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready } |
|
11/04/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/04/2022 | COT - LCBU - Framing | Passed | ||
11/04/2022 | COT - RSEL - Construction Power | Passed | clearance required. TEP ECO | |
11/04/2022 | RSME - Mechanical Progress | Passed | ||
11/04/2022 | COT - RSPL - Gas Pressure Test | Passed | ||
11/18/2022 | COT - HCBU - Interior Shear Bracing | Passed | ||
02/08/2023 | COT - RSPL - Plumbing Final | Passed | ||
02/08/2023 | COT - BULD - SWG Clearance | Passed | SWG clearance required | |
02/17/2023 | COT - RSEL - Electrical Final | Passed | ||
02/17/2023 | COT - RSME - Mechanical Final | Passed | ||
02/17/2023 | RSBU - Building Final | Passed | ||
02/17/2023 | COT - RSEL - Outdoor Lighting | Passed |