Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
825 N 3RD AV
Apply Date:
03/08/2022
Applicant:
Robert Knodle
Description:
Replace Window with Door; Renovate Chimney and Relocate Water Heater

Permit Reviews

Permit Number - T22CM01665
Permit Status: Issued
Permit Description: Replace Window with Door; Renovate Chimney and Relocate Water Heater
Start Date Submittal Complete Date Status  
03/08/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 08/02/2022 COMPLETED Review Details
08/29/2022 RESUBMITTAL 08/31/2022 COMPLETED Review Details

Conditions

Permit Number - T22CM01665
Permit Status: Issued
Permit Description: Replace Window with Door; Renovate Chimney and Relocate Water Heater
Date Description Comments
09/02/2022 General Contractor Letter (GCL) or Owner/Builder Waiver required prior to permit issuance

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM01665
Permite Description: Replace Window with Door; Renovate Chimney and Relocate Water Heater
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
08/30/2022 RSME - Mechanical Progress N/A Canceled {Activity date: 08/30/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
10/26/2022 COT - RSBU - Roof Nailing N/A Not Ready
10/26/2022 COT - RSBU - Preslab N/A Not Ready
10/26/2022 COT - RSBU - Exterior Clips/Sheathing N/A Not Ready
10/26/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM01665
Permit Description: Replace Window with Door; Renovate Chimney and Relocate Water Heater
Total Completed Inspections - 9
Date Description Inspector Results Comments
02/24/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed mechanical, electrical, and plumbing rough in are complete.
02/24/2023 COT - RSPL - Rough Soil Passed
02/24/2023 COT - RSPL - Gas Pressure Test Passed holding 15# of air.
02/24/2023 COT - BULD - SWG Clearance Passed passed gas line pressure test.
03/21/2023 COT - LCBU - Framing Passed
07/30/2024 COT - RSME - Mechanical Final Passed
07/30/2024 RSBU - Building Final Passed
07/30/2024 COT - RSPL - Plumbing Final Passed
07/30/2024 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
HISTORIC REVIEW PACKAGE.PDF DOCUMENTS VIEW
HISTORIC REVIEW RETAINING WALL.PDF DOCUMENTS VIEW
HPZ DL SIGNED.PDF DOCUMENTS VIEW
OBW.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW