Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/01/2022
Applicant:
Description:
TENANT IMPROVEMENT OF A FIRST-TIME BUILD-OUT INTERIOR SPACE IN A NEW MULTI-TENANT SINGLE-LEVEL BUILD

Permit Reviews

Permit Number - T22CM01462
Permit Status: Complete
Permit Description: TENANT IMPROVEMENT OF A FIRST-TIME BUILD-OUT INTERIOR SPACE IN A NEW MULTI-TENANT SINGLE-LEVEL BUILD
Start Date Submittal Complete Date Status  
03/01/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 04/20/2022 COMPLETED Review Details
07/13/2022 RESUBMITTAL 08/25/2022 COMPLETED Review Details
08/26/2022 RESUBMITTAL 08/29/2022 COMPLETED Review Details
12/12/2022 COMMERCIAL REVIEW - FULL v.2 12/20/2022 APPROVED Review Details
08/02/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/02/2023 APPROVED Review Details
08/04/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/09/2023 APPROVED Review Details
05/25/2023 COMMERCIAL REVIEW - FULL v.1 06/01/2023 APPROVED Review Details
11/30/2022 COMMERCIAL REVIEW - FULL v.1 12/12/2022 REQUIRES RESUBMIT Review Details
08/01/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/02/2023 APPROVED Review Details

Conditions

Permit Number - T22CM01462
Permit Status: Complete
Permit Description: TENANT IMPROVEMENT OF A FIRST-TIME BUILD-OUT INTERIOR SPACE IN A NEW MULTI-TENANT SINGLE-LEVEL BUILD
Date Description Comments
07/20/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/20/2022 SPECIAL INSPECTION IS REQUIRED FOR WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION.
07/20/2022 SPECIAL INSPECTION IS REQUIRED FOR AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECTION.
12/20/2022 Contractor's active Arizona Contractor's License number for specified scope of work required prior to issuance of permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM01462
Permite Description: TENANT IMPROVEMENT OF A FIRST-TIME BUILD-OUT INTERIOR SPACE IN A NEW MULTI-TENANT SINGLE-LEVEL BUILD
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
07/20/2022 COT - LCME - Mechanical Final N/A Re-inspection required {Activity date: 07/20/2022; Status: Prior to Final Inspectn; Inspector: DBENOIT; Comment: Entered by DBENOIT1 - AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECITON}
07/20/2022 COT - LCPL - Plumbing Final N/A Re-inspection required {Activity date: 07/20/2022; Status: Prior to Final Inspectn; Inspector: DBENOIT; Comment: Entered by DBENOIT1 - WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION}
08/07/2023 COT - BULD - SWG Clearance N/A Not Applicable
07/11/2023 COT - HCME - Kitchen Hood N/A Partial Pass ok to install insulation and bands
06/16/2023 COT - HCPL - Plumbing Intermediate N/A Partial Pass 6-16-24: Walls.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM01462
Permit Description: TENANT IMPROVEMENT OF A FIRST-TIME BUILD-OUT INTERIOR SPACE IN A NEW MULTI-TENANT SINGLE-LEVEL BUILD
Total Completed Inspections - 27
Date Description Inspector Results Comments
05/30/2023 COT - LCBU - Preslab Passed
06/13/2023 COT - HCEL - Electrical Intermediate Passed In wall electric throughout. Ok to cover progress areas.
06/28/2023 BULD - Electrical Clearance Passed
07/19/2023 COT - HCPL - Gas Pressure Test Passed
07/20/2023 COT - HCME - Mechanical Above Ceiling Passed
07/28/2023 COT - HCME - Mechanical Final Passed
08/02/2023 COT - FCON - Fire - Final Passed
08/03/2023 COT - HCEL - Electrical Final Passed
08/03/2023 COT - HCBU - Building Final Passed recommend for C/O
08/03/2023 COT - HCPL - Gas Final Passed
08/03/2023 COT - HCPL - Plumbing Final Passed
08/07/2023 ENGR Engineering Final Passed
08/07/2023 COT - HCBU - Building Progress Passed
08/08/2023 TRSP - ROW - Final/Close-Out Passed
08/07/2023 COT - HCBU - Framing Passed
08/07/2023 COT - HCBU - Interior Shear Bracing Passed
08/07/2023 COT - HCEL - Electrical Above Ceiling Passed
08/07/2023 COT - HCEL - Electrical Progress Passed
08/07/2023 COT - HCEL - Electrical Underground Passed
08/07/2023 COT - HCEL - Outdoor Lighting Passed
08/07/2023 COT - HCME - Kitchen Hood Passed
08/07/2023 COT - HCME - Mechanical Intermediate Passed
08/07/2023 COT - HCME - Mechanical Progress Passed
08/07/2023 COT - HCPL - Plumbing Above Ceiling Passed
08/07/2023 COT - HCPL - Plumbing Progress Passed
08/07/2023 COT - HCPL - Plumbing Intermediate Passed
08/07/2023 COT - HCPL - Rough Soil Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
22034 MOD PIZZA TUCSON MARKETPLACE - BACKFLOW CERTIFICATE_V1.PDF DOCUMENTS VIEW
22034 MOD PIZZA TUCSON MARKETPLACE - WATER CHLORINATION-2023-08-02_V1.PDF DOCUMENTS VIEW
MOD PIZZA AT TUCSON MARKETPLACE - TEST AND BALANCE REPORT AND FLOORPLAN_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CAL-AZ-01-ELECTRICAL_V1.PDF DOCUMENTS VIEW
MOD PIZZA-TUCSON, AZ -ELECT PANEL ADDENDUM_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-MOD PIZZA-TUCZON, AZ REV 3 SET_V1.PDF DOCUMENTS VIEW
MOD PIZZA - TUCSON REV 4 - SIGNED_V1.PDF DOCUMENTS VIEW
MOD PIZZA - TUSCON, AZ PERMIT SET - REV COMBINED_V1.PDF DOCUMENTS VIEW
MOD PIZZA-TUCSON, AZ REV 3 NARRATIVE_V1.PDF DOCUMENTS VIEW
MOD PIZZA-TUCSON, AZ REV 4 NARRATIVE_V1.PDF DOCUMENTS VIEW
TRANSMITTAL-UPDATED CONTACT INFO_V1.PDF DOCUMENTS VIEW