Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/01/2022
Applicant:
Brad Samuels
Description:
210 unit apartment omplex with clubhouse, landscaped courtyard and pool, and other amenities. Clubho

Permit Reviews

Permit Number - T22CM01459
Permit Status: Complete
Permit Description: 210 unit apartment omplex with clubhouse, landscaped courtyard and pool, and other amenities. Clubho
Start Date Submittal Complete Date Status  
03/01/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 05/02/2022 COMPLETED Review Details
06/30/2022 RESUBMITTAL 07/19/2022 COMPLETED Review Details
08/12/2022 RESUBMITTAL 08/29/2022 COMPLETED Review Details
09/13/2022 RESUBMITTAL 09/26/2022 COMPLETED Review Details
10/03/2022 RESUBMITTAL 10/06/2022 COMPLETED Review Details
12/15/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/18/2023 APPROVED Review Details
05/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/16/2024 APPROVED Review Details

Conditions

Permit Number - T22CM01459
Permit Status: Complete
Permit Description: 210 unit apartment omplex with clubhouse, landscaped courtyard and pool, and other amenities. Clubho
Date Description Comments
03/15/2024 AIR BALANCING REPORT IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
10/06/2022 SPECIAL INSPECTION IS REQUIRED FOR WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION.
10/06/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE
03/15/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
03/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
03/15/2024 SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM01459
Permite Description: 210 unit apartment omplex with clubhouse, landscaped courtyard and pool, and other amenities. Clubho
Total Outstanding Inspections - 13
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
11/09/2023 COT - LCBU - Building Final N/A Partial Pass Level 2 TCO. Partial pass. 11/9/2023
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
11/14/2023 FCON – OH Piping & Hydro N/A Not Applicable
11/14/2023 COT - FCON - Fire - Final N/A Partial Pass Approved for level 2 TCO
10/06/2023 COT - LCBU - Building Progress N/A Partial Pass 180’ gas line pressure test from barbecue grill to the fire pit.
Total of 8 light pole basis. Rebar per plan okay for concrete placement. 10/6/2023
11/09/2023 COT - LCEL - Electrical Final N/A Partial Pass Level 2 TCO. Partial pass. 11/9/2023
09/21/2023 COT - LCEL - Electrical Progress N/A Not Ready Rough in of electrical is ongoing in clubhouse.
9/21/23: Not ready
02/13/2024 COT - LCBU - Sustainability N/A Not Applicable
10/04/2023 COT - LCEL - Outdoor Lighting N/A Partial Pass Four poles at Southwest corner.
03/08/2023 COT - LCME - Mechanical Progress N/A Partial Pass Mechanical ductwork is installed in rafters. Flex duct is installed for registers in drop ceiling.
11/09/2023 COT - LCME - Mechanical Final N/A Partial Pass Level 2 TCO. Partial pass. 11/9/2023
11/09/2023 COT - LCPL - Plumbing Final N/A Partial Pass Level 2 TCO. Partial pass. 11/9/2023

Completed Inspections

Permit Status: Complete
Permit Number: T22CM01459
Permit Description: 210 unit apartment omplex with clubhouse, landscaped courtyard and pool, and other amenities. Clubho
Total Completed Inspections - 34
Date Description Inspector Results Comments
01/27/2023 COT - LCBU - Roof Nailing Passed roof sheathing is properly nailed off on clubhouse. okay to dry-in and start roofing application.
02/10/2023 COT - LCBU - Exterior Clips/Sheathing Passed partial approval for first floor exterior sheathing hold downs not complete, clips on exterior complete
02/14/2023 BULD - Electrical Clearance Passed address is 4500 S LANDING WAY
TEMP POWER
02/22/2023 COT - LCPL - Plumbing Roof Drains Passed
03/08/2023 COT - LCBU - Framing Passed Clubhouse framing is complete. Okay to insulate and sheet rock.
03/08/2023 COT - HCBU - Interior Shear Bracing Passed Clubhouse interior shear wall are complete and properly screwed off.
03/08/2023 COT - HCBU - Exterior Clips/Sheathing Passed Shear wall hold downs are installed and properly bolted.
03/08/2023 COT - LCPL - Plumbing Progress Passed All rough in plumbing is complete.
08/18/2023 COT - LCPL - Gas Pressure Test Passed Gas line for pool heater is installed in trench and holding 15# of air pressure. Okay to shade pipe and backfill trench.
08/18/2023 COT - LCPL - Backwater Valve Passed
08/18/2023 COT - LCBU - Preslab Passed
08/18/2023 COT - LCBU - Firewall/Fire Barrier/Firestop Passed
08/18/2023 COT - LCPL - Plumbing Intermediate Passed 8/18/23: Underground plumbing for pool pump location is complete and under water pressure test which is holding with no leaks. Okay to shade water lines and backfill trench.
08/18/2023 COT - LCEL - Electrical Intermediate Passed 8/18/23: Electrical rough-in is complete throughout Clubhouse. Electrical underground for swimming pool pump location is complete, okay to shade pipes and backfill trench.
08/18/2023 COT - LCPL - Sewer Passed
08/18/2023 COT - LCME - Mechanical Intermediate Passed 8/18/23: Mechanical rough-in is complete throughout Clubhouse.
08/18/2023 COT - LCEL - Electrical Underground Passed 8/18/23: Electrical underground for swimming pool pump location is complete, okay to shade pipes and backfill trench.
09/26/2023 COT - LCEL - Service Upgrade Passed 9/21/23: Not ready

9/22/23: T22CM01459/CLUBHOUSE ECO TEP clearance ok to energize
10/02/2023 COT - LCPL - Plumbing Above Ceiling Passed
10/02/2023 COT - LCBU - Building Above Ceiling Passed
10/02/2023 COT - LCEL - Electrical Above Ceiling Passed
11/07/2023 COT - LCME - Mechanical Above Ceiling Passed
11/21/2023 COT - FCON - Alarm - Final Passed
11/14/2023 COT - FCON - Sprinkler - Final Passed
11/21/2023 COT - FCON - Fire - Final Passed
11/30/2023 COT - LCBU - Building Progress Passed
02/13/2024 COT - LCEL - Electrical Final Passed
02/13/2024 COT - LCEL - Electrical Progress Passed
02/13/2024 COT - LCEL - Outdoor Lighting Passed
02/13/2024 COT - LCME - Mechanical Progress Passed
02/13/2024 COT - LCME - Mechanical Final Passed
02/13/2024 COT - LCPL - Plumbing Final Passed
05/16/2024 ENGR Engineering Final Passed
05/17/2024 COT - HCBU - Building Final Passed 5/17/24: building 8 ok for CofO