Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/01/2022
Applicant:
Brent Stevens
Description:
210 unit apartment omplex with clubhouse, landscaped courtyard and pool, and other amenities. Clubho

Permit Reviews

Permit Number - T22CM01459
Permit Status: Complete
Permit Description: 210 unit apartment omplex with clubhouse, landscaped courtyard and pool, and other amenities. Clubho
Start Date Submittal Complete Date Status  
03/01/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 05/02/2022 COMPLETED Review Details
06/30/2022 RESUBMITTAL 07/19/2022 COMPLETED Review Details
08/12/2022 RESUBMITTAL 08/29/2022 COMPLETED Review Details
09/13/2022 RESUBMITTAL 09/26/2022 COMPLETED Review Details
10/03/2022 RESUBMITTAL 10/06/2022 COMPLETED Review Details
12/15/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/18/2023 APPROVED Review Details
05/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/16/2024 APPROVED Review Details

Conditions

Permit Number - T22CM01459
Permit Status: Complete
Permit Description: 210 unit apartment omplex with clubhouse, landscaped courtyard and pool, and other amenities. Clubho
Date Description Comments
03/15/2024 AIR BALANCING REPORT IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
10/06/2022 SPECIAL INSPECTION IS REQUIRED FOR WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION.
10/06/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE
03/15/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
03/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
03/15/2024 SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM01459
Permite Description: 210 unit apartment omplex with clubhouse, landscaped courtyard and pool, and other amenities. Clubho
Total Outstanding Inspections - 13
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
11/09/2023 COT - LCBU - Building Final N/A Partial Pass Level 2 TCO. Partial pass. 11/9/2023
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
11/14/2023 FCON – OH Piping & Hydro N/A Not Applicable
11/14/2023 COT - FCON - Fire - Final N/A Partial Pass Approved for level 2 TCO
10/06/2023 COT - LCBU - Building Progress N/A Partial Pass 180’ gas line pressure test from barbecue grill to the fire pit.
Total of 8 light pole basis. Rebar per plan okay for concrete placement. 10/6/2023
11/09/2023 COT - LCEL - Electrical Final N/A Partial Pass Level 2 TCO. Partial pass. 11/9/2023
09/21/2023 COT - LCEL - Electrical Progress N/A Not Ready Rough in of electrical is ongoing in clubhouse.
9/21/23: Not ready
02/13/2024 COT - LCBU - Sustainability N/A Not Applicable
10/04/2023 COT - LCEL - Outdoor Lighting N/A Partial Pass Four poles at Southwest corner.
03/08/2023 COT - LCME - Mechanical Progress N/A Partial Pass Mechanical ductwork is installed in rafters. Flex duct is installed for registers in drop ceiling.
11/09/2023 COT - LCME - Mechanical Final N/A Partial Pass Level 2 TCO. Partial pass. 11/9/2023
11/09/2023 COT - LCPL - Plumbing Final N/A Partial Pass Level 2 TCO. Partial pass. 11/9/2023

Completed Inspections

Permit Status: Complete
Permit Number: T22CM01459
Permit Description: 210 unit apartment omplex with clubhouse, landscaped courtyard and pool, and other amenities. Clubho
Total Completed Inspections - 34
Date Description Inspector Results Comments
01/27/2023 COT - LCBU - Roof Nailing Passed roof sheathing is properly nailed off on clubhouse. okay to dry-in and start roofing application.
02/10/2023 COT - LCBU - Exterior Clips/Sheathing Passed partial approval for first floor exterior sheathing hold downs not complete, clips on exterior complete
02/14/2023 BULD - Electrical Clearance Passed address is 4500 S LANDING WAY
TEMP POWER
02/22/2023 COT - LCPL - Plumbing Roof Drains Passed
03/08/2023 COT - LCBU - Framing Passed Clubhouse framing is complete. Okay to insulate and sheet rock.
03/08/2023 COT - HCBU - Interior Shear Bracing Passed Clubhouse interior shear wall are complete and properly screwed off.
03/08/2023 COT - HCBU - Exterior Clips/Sheathing Passed Shear wall hold downs are installed and properly bolted.
03/08/2023 COT - LCPL - Plumbing Progress Passed All rough in plumbing is complete.
08/18/2023 COT - LCPL - Gas Pressure Test Passed Gas line for pool heater is installed in trench and holding 15# of air pressure. Okay to shade pipe and backfill trench.
08/18/2023 COT - LCPL - Backwater Valve Passed
08/18/2023 COT - LCBU - Preslab Passed
08/18/2023 COT - LCBU - Firewall/Fire Barrier/Firestop Passed
08/18/2023 COT - LCPL - Plumbing Intermediate Passed 8/18/23: Underground plumbing for pool pump location is complete and under water pressure test which is holding with no leaks. Okay to shade water lines and backfill trench.
08/18/2023 COT - LCEL - Electrical Intermediate Passed 8/18/23: Electrical rough-in is complete throughout Clubhouse. Electrical underground for swimming pool pump location is complete, okay to shade pipes and backfill trench.
08/18/2023 COT - LCPL - Sewer Passed
08/18/2023 COT - LCME - Mechanical Intermediate Passed 8/18/23: Mechanical rough-in is complete throughout Clubhouse.
08/18/2023 COT - LCEL - Electrical Underground Passed 8/18/23: Electrical underground for swimming pool pump location is complete, okay to shade pipes and backfill trench.
09/26/2023 COT - LCEL - Service Upgrade Passed 9/21/23: Not ready

9/22/23: T22CM01459/CLUBHOUSE ECO TEP clearance ok to energize
10/02/2023 COT - LCPL - Plumbing Above Ceiling Passed
10/02/2023 COT - LCBU - Building Above Ceiling Passed
10/02/2023 COT - LCEL - Electrical Above Ceiling Passed
11/07/2023 COT - LCME - Mechanical Above Ceiling Passed
11/21/2023 COT - FCON - Alarm - Final Passed
11/14/2023 COT - FCON - Sprinkler - Final Passed
11/21/2023 COT - FCON - Fire - Final Passed
11/30/2023 COT - LCBU - Building Progress Passed
02/13/2024 COT - LCEL - Electrical Final Passed
02/13/2024 COT - LCEL - Electrical Progress Passed
02/13/2024 COT - LCEL - Outdoor Lighting Passed
02/13/2024 COT - LCME - Mechanical Progress Passed
02/13/2024 COT - LCME - Mechanical Final Passed
02/13/2024 COT - LCPL - Plumbing Final Passed
05/16/2024 ENGR Engineering Final Passed
05/17/2024 COT - HCBU - Building Final Passed 5/17/24: building 8 ok for CofO

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
CONS-COMPLETESTAMPEDSET - 10.21.22_V1.PDF DOCUMENTS VIEW
LETTERS OF TORQUE FOR BUILDINGS 1-6 - CLUBHOUSE_V1.PDF DOCUMENTS VIEW
TUCSON LANDING APTS. CLUBHOUSE - REPORT (REV.)_V1.PDF DOCUMENTS VIEW
TUCSON LANDING APTS. CLUBHOUSE-2024-05-13_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
TUCSON LANDING LAB REPORT 12-13-23-2023-12-14_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
COMCHECK BLDG TYPE A.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
COMCHECK BLDG TYPE B.PDF DOCUMENTS VIEW
COMCHECK BLDG TYPE D.PDF DOCUMENTS VIEW
COMCHECK BLDG TYPE C.PDF DOCUMENTS VIEW
COMCHECK CLUBHOUSE.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT.PDF DOCUMENTS VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
HVAC CALCULATIONS.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
SPECIFICATION MANUAL.PDF DOCUMENTS VIEW
PLAN SET 1 OF 2.PDF CONSTRPLANS VIEW
PLAN SET 2 OF 2.PDF CONSTRPLANS VIEW