Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/01/2022
Applicant:
Brad Samuels
Description:
210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 6

Permit Reviews

Permit Number - T22CM01454
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 6
Start Date Submittal Complete Date Status  
03/01/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 05/02/2022 COMPLETED Review Details
06/30/2022 RESUBMITTAL 07/19/2022 COMPLETED Review Details
08/12/2022 RESUBMITTAL 08/29/2022 COMPLETED Review Details
09/13/2022 RESUBMITTAL 09/26/2022 COMPLETED Review Details
10/03/2022 RESUBMITTAL 10/06/2022 COMPLETED Review Details
05/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/16/2024 APPROVED Review Details
06/03/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/10/2024 APPROVED Review Details
06/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/13/2024 APPROVED Review Details
12/19/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/20/2023 APPROVED Review Details

Conditions

Permit Number - T22CM01454
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 6
Date Description Comments
03/09/2024 AIR BALANCING REPORT IS REQUIRED.
10/06/2022 SPECIAL INSPECTION IS REQUIRED FOR WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION.
10/06/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE
03/09/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/09/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/09/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
05/15/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/09/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/09/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
03/09/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
03/09/2024 SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED.
03/09/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
03/09/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM01454
Permite Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 6
Total Outstanding Inspections - 19
Last Inspection Date Description Inspector Results Comments
11/01/2022 COT - LCEL - Electrical Underground N/A Partial Pass partial. UFER is installed in footing, building 6/F.
03/30/2023 COT - LCEL - Electrical Intermediate N/A Partial Pass south 1/2 of building
03/30/2023 COT - LCPL - Plumbing Above Ceiling N/A Partial Pass south 1/2 of building
03/30/2023 COT - LCBU - Firewall/Fire Barrier/Firestop N/A Partial Pass south 1/2 of building
03/30/2023 COT - LCPL - Plumbing Roof Drains N/A Partial Pass south 1/2 of building
03/30/2023 COT - LCME - Mechanical Intermediate N/A Partial Pass south 1/2 of building
03/30/2023 COT - LCME - Mechanical Above Ceiling N/A Partial Pass south 1/2 of building
11/01/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Partial Pass building 6/F footings okay to pour concrete.
04/07/2023 COT - LCPL - Backwater Valve N/A Not Applicable Not required on this project.
03/30/2023 COT - LCEL - Electrical Above Ceiling N/A Partial Pass south 1/2 of building
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
01/17/2024 COT - LCBU - Building Final N/A Partial Pass 12/5/23:not ready
12/6/23 several t-Tops on roof missing and not foamed where line sets penetrate roof please change bird screen to quarter inch max opening on Tops please secure electrical whips and line sets with mechanical fasteners. Zip ties are not acceptable. Sunshield all line sets.
1/17/24: Level 4 TCO for full building.
02/13/2024 COT - LCBU - Sustainability N/A Not Applicable
10/26/2022 FCON – OH Piping & Hydro N/A Not Ready
12/04/2023 ENGR Engineering Final N/A Partial Pass OK FOR A LEVEL 4 TCO ON BUILDING 6

Completed Inspections

Permit Status: Complete
Permit Number: T22CM01454
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 6
Total Completed Inspections - 26
Date Description Inspector Results Comments
11/30/2022 COT - LCEL - Electrical Underground Passed Approved Bldg 6
11/30/2022 COT - LCBU - Preslab Passed Approved Bldg 6, okay for concrete placement
02/24/2023 COT - LCBU - Roof Nailing Passed
03/29/2023 COT - LCBU - Exterior Clips/Sheathing Passed
03/30/2023 COT - LCBU - Building Above Ceiling Passed
04/07/2023 COT - LCPL - Rough Soil Passed All 8 buildings foundations and underground plumbing is complete.
04/07/2023 COT - LCBU - Excavation/Rebar/Zoning Passed All 8 buildings foundations are complete.
04/07/2023 COT - LCPL - Plumbing Progress Passed Plumbing rough in is complete in building 6. Okay to insulate and sheet rock interior walls.
04/07/2023 COT - LCEL - Electrical Progress Passed Electrical rough in is complete in building 6. Okay to insulate and sheet rock interior walls.
04/07/2023 COT - LCME - Mechanical Progress Passed Mechanical rough in is complete in building 6. Okay to insulate and sheet rock interior walls.
09/19/2023 COT - HCBU - Interior Shear Bracing Passed
09/19/2023 COT - LCPL - Plumbing Intermediate Passed
09/19/2023 COT - LCEL - Electrical Above Ceiling Passed
09/19/2023 COT - LCBU - Framing Passed
09/19/2023 COT - LCPL - Sewer Passed
10/30/2023 COT - LCEL - Service Upgrade Passed ECO -
6101-6108
6201-6208
6301-6308
11/22/2023 COT - FCON - Alarm - Final Passed
11/22/2023 COT - FCON - Sprinkler - Final Passed
12/04/2023 COT - FCON - Fire - Final Passed
12/06/2023 COT - LCEL - Electrical Final Passed
12/06/2023 COT - LCPL - Plumbing Final Passed
12/06/2023 COT - LCME - Mechanical Final Passed
02/13/2024 COT - LCEL - Outdoor Lighting Passed
02/13/2024 COT - LCBU - Building Progress Passed
05/16/2024 ENGR Engineering Final Passed
05/24/2024 COT - HCBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
RESPONSE TO CITY STRUTURAL STEEL WELD INSPECTION CONDITION FOR BLDG 6_V1.PDF DOCUMENTS VIEW
TLAP 24.06.05 TAB MEMO_V1.PDF DOCUMENTS VIEW
061753-006 ROOF TRUSSES METT APN_V1.PDF DOCUMENTS VIEW
SUBMITTAL _5 ALL BUILDING FLOOR TRUSSES-METT REVIEWED_V1.PDF DOCUMENTS VIEW
CONS-COMPLETESTAMPEDSET - 10.21.22_V1.PDF DOCUMENTS VIEW
LETTERS OF TORQUE FOR BUILDINGS 1-6 - CLUBHOUSE_V1.PDF DOCUMENTS VIEW
TUCSON LANDING APTS BUILDING NO. 6-2024-05-13_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
TUCSON LANDING LAB REPORT 12-13-23-2023-12-14_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
COMCHECK BLDG TYPE A.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
COMCHECK BLDG TYPE B.PDF DOCUMENTS VIEW
COMCHECK BLDG TYPE D.PDF DOCUMENTS VIEW
COMCHECK BLDG TYPE C.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT.PDF DOCUMENTS VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
COMCHECK CLUBHOUSE.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
HVAC CALCULATIONS.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
SPECIFICATION MANUAL.PDF DOCUMENTS VIEW
PLAN SET 1 OF 2.PDF CONSTRPLANS VIEW
PLAN SET 2 OF 2.PDF CONSTRPLANS VIEW