Permit Reviews
Permit Number - T22CM01454
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 6
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/01/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 05/02/2022 | COMPLETED |
06/30/2022 | RESUBMITTAL | 07/19/2022 | COMPLETED |
08/12/2022 | RESUBMITTAL | 08/29/2022 | COMPLETED |
09/13/2022 | RESUBMITTAL | 09/26/2022 | COMPLETED |
10/03/2022 | RESUBMITTAL | 10/06/2022 | COMPLETED |
05/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/16/2024 | APPROVED |
06/03/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/10/2024 | APPROVED |
06/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/13/2024 | APPROVED |
12/19/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/20/2023 | APPROVED |
Conditions
Permit Number - T22CM01454
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 6
Date | Description | Comments |
---|---|---|
03/09/2024 | AIR BALANCING REPORT IS REQUIRED. | |
10/06/2022 | SPECIAL INSPECTION IS REQUIRED FOR WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION. | |
10/06/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE | |
03/09/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
03/09/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/09/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
05/15/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
03/09/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
03/09/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
03/09/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
03/09/2024 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. | |
03/09/2024 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
03/09/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM01454
Permite Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 6
Total Outstanding Inspections - 19
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/01/2022 | COT - LCEL - Electrical Underground | N/A | Partial Pass | partial. UFER is installed in footing, building 6/F. |
03/30/2023 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | south 1/2 of building |
03/30/2023 | COT - LCPL - Plumbing Above Ceiling | N/A | Partial Pass | south 1/2 of building |
03/30/2023 | COT - LCBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | south 1/2 of building |
03/30/2023 | COT - LCPL - Plumbing Roof Drains | N/A | Partial Pass | south 1/2 of building |
03/30/2023 | COT - LCME - Mechanical Intermediate | N/A | Partial Pass | south 1/2 of building |
03/30/2023 | COT - LCME - Mechanical Above Ceiling | N/A | Partial Pass | south 1/2 of building |
11/01/2022 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | building 6/F footings okay to pour concrete. |
04/07/2023 | COT - LCPL - Backwater Valve | N/A | Not Applicable | Not required on this project. |
03/30/2023 | COT - LCEL - Electrical Above Ceiling | N/A | Partial Pass | south 1/2 of building |
10/26/2022 | COT - FCON - Alarm - Final | N/A | Not Ready | |
10/26/2022 | COT - FCON - Sprinkler - Final | N/A | Not Ready | |
10/26/2022 | COT - FCON - Fire - Final | N/A | Not Ready | |
10/26/2022 | COT - LCPL - Plumbing Final | N/A | Not Ready | |
10/26/2022 | COT - LCME - Mechanical Final | N/A | Not Ready | |
01/17/2024 | COT - LCBU - Building Final | N/A | Partial Pass | 12/5/23:not ready 12/6/23 several t-Tops on roof missing and not foamed where line sets penetrate roof please change bird screen to quarter inch max opening on Tops please secure electrical whips and line sets with mechanical fasteners. Zip ties are not acceptable. Sunshield all line sets. 1/17/24: Level 4 TCO for full building. |
02/13/2024 | COT - LCBU - Sustainability | N/A | Not Applicable | |
10/26/2022 | FCON – OH Piping & Hydro | N/A | Not Ready | |
12/04/2023 | ENGR Engineering Final | N/A | Partial Pass | OK FOR A LEVEL 4 TCO ON BUILDING 6 |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM01454
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 6
Total Completed Inspections - 26
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/30/2022 | COT - LCEL - Electrical Underground | Passed | Approved Bldg 6 | |
11/30/2022 | COT - LCBU - Preslab | Passed | Approved Bldg 6, okay for concrete placement | |
02/24/2023 | COT - LCBU - Roof Nailing | Passed | ||
03/29/2023 | COT - LCBU - Exterior Clips/Sheathing | Passed | ||
03/30/2023 | COT - LCBU - Building Above Ceiling | Passed | ||
04/07/2023 | COT - LCPL - Rough Soil | Passed | All 8 buildings foundations and underground plumbing is complete. | |
04/07/2023 | COT - LCBU - Excavation/Rebar/Zoning | Passed | All 8 buildings foundations are complete. | |
04/07/2023 | COT - LCPL - Plumbing Progress | Passed | Plumbing rough in is complete in building 6. Okay to insulate and sheet rock interior walls. | |
04/07/2023 | COT - LCEL - Electrical Progress | Passed | Electrical rough in is complete in building 6. Okay to insulate and sheet rock interior walls. | |
04/07/2023 | COT - LCME - Mechanical Progress | Passed | Mechanical rough in is complete in building 6. Okay to insulate and sheet rock interior walls. | |
09/19/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
09/19/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
09/19/2023 | COT - LCEL - Electrical Above Ceiling | Passed | ||
09/19/2023 | COT - LCBU - Framing | Passed | ||
09/19/2023 | COT - LCPL - Sewer | Passed | ||
10/30/2023 | COT - LCEL - Service Upgrade | Passed | ECO - 6101-6108 6201-6208 6301-6308 |
|
11/22/2023 | COT - FCON - Alarm - Final | Passed | ||
11/22/2023 | COT - FCON - Sprinkler - Final | Passed | ||
12/04/2023 | COT - FCON - Fire - Final | Passed | ||
12/06/2023 | COT - LCEL - Electrical Final | Passed | ||
12/06/2023 | COT - LCPL - Plumbing Final | Passed | ||
12/06/2023 | COT - LCME - Mechanical Final | Passed | ||
02/13/2024 | COT - LCEL - Outdoor Lighting | Passed | ||
02/13/2024 | COT - LCBU - Building Progress | Passed | ||
05/16/2024 | ENGR Engineering Final | Passed | ||
05/24/2024 | COT - HCBU - Building Progress | Passed |