Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM01452
Permit Details
Apply Date:
03/01/2022
Applicant:
Brent Stevens
Description:
210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 4
Permit Reviews
Permit Number - T22CM01452
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 4
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/01/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 05/02/2022 | COMPLETED |
06/30/2022 | RESUBMITTAL | 07/19/2022 | COMPLETED |
08/12/2022 | RESUBMITTAL | 08/29/2022 | COMPLETED |
09/13/2022 | RESUBMITTAL | 09/26/2022 | COMPLETED |
10/03/2022 | RESUBMITTAL | 10/06/2022 | COMPLETED |
06/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/20/2024 | APPROVED |
06/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/17/2024 | APPROVED |
06/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/06/2024 | APPROVED |
Conditions
Permit Number - T22CM01452
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 4
Date | Description | Comments |
---|---|---|
06/11/2024 | AIR BALANCING REPORT IS REQUIRED. | |
06/11/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
10/06/2022 | SPECIAL INSPECTION IS REQUIRED FOR WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION. | |
10/06/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE | |
06/11/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
06/12/2024 | PCRWRD requests that the City of Tucson, add the PCRWRD Condition to the COT building permit #T22CM01449:ISSUED WITH PCRWRD CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE DISCHARGE AUTHORIZATION IS ISSUED BY PDEQ FOR THE PRIVATE SEWER #P22SD00039 Gerry KoziolPima County DSD-Building Codes/Wastewater Utility Fee201 N Stone Ave Tucson, AZ 85701(520)724-6503 | |
06/11/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/11/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
06/11/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
06/11/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
06/11/2024 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
06/11/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
06/11/2024 | SHOP DRAWINGS REQUIRED FOR WOOD FLOOR JOISTS. | |
06/11/2024 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM01452
Permite Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 4
Total Outstanding Inspections - 16
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/03/2023 | COT - LCPL - Backwater Valve | N/A | Not Applicable | Not required on this building. |
05/08/2023 | COT - LCBU - Exterior Clips/Sheathing | N/A | Partial Pass | awaiting pop outs |
09/01/2023 | COT - LCME - Mechanical Above Ceiling | N/A | Partial Pass | Note:Inspection for East 12 units only. |
09/01/2023 | COT - LCEL - Electrical Above Ceiling | N/A | Partial Pass | Note:Inspection for East 12 units only. Firewall above ceiling per approved plans. |
09/01/2023 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | Note:Inspection for East 12 units only. |
09/01/2023 | COT - LCME - Mechanical Intermediate | N/A | Partial Pass | Note:Inspection for East 12 units only. Firewall above ceiling per approved plans. |
09/01/2023 | COT - LCPL - Plumbing Intermediate | N/A | Re-inspection required | Note:Inspection for East 12 units only. Need 18" of copper before transitioning to per at water heaters. |
09/01/2023 | COT - LCBU - Framing | N/A | Partial Pass | Note:Inspection for East 12 units only. Firewall above ceiling per approved plans. |
09/19/2023 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | 9/19/23: not ready |
10/26/2022 | FCON – OH Piping & Hydro | N/A | Not Ready | |
10/26/2022 | COT - FCON - Alarm - Final | N/A | Not Ready | |
10/26/2022 | COT - FCON - Sprinkler - Final | N/A | Not Ready | |
10/26/2022 | COT - FCON - Fire - Final | N/A | Not Ready | |
01/24/2024 | COT - LCEL - Electrical Progress | N/A | Partial Pass | 1/19/24: passed by Wayne Gallagher, Clearance for units 4102, 4302, 4202, 4101, 4301, 4201, 4103, 4203, 4304, 4204, 4104, 4303, 4305, 4205, 4105,4106, 4207, 4306, 4206, 4107, 4307, 4308, 4208, 4108 and HPD1 |
10/26/2022 | COT - LCME - Mechanical Final | N/A | Not Ready | |
10/26/2022 | COT - LCPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM01452
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 4
Total Completed Inspections - 34
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/20/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
01/13/2023 | COT - LCPL - Rough Soil | Passed | ||
04/14/2023 | COT - LCBU - Preslab | Passed | ||
05/03/2023 | COT - LCEL - Electrical Underground | Passed | ||
05/03/2023 | COT - LCBU - Roof Nailing | Passed | Roof nailing is complete. | |
05/10/2023 | COT - LCBU - Exterior Clips/Sheathing | Passed | Decorative bump-out on exterior of building is properly nailed off and joints are sealed. Okay to prepare for stucco application. | |
09/01/2023 | COT - LCPL - Sewer | Passed | ||
09/01/2023 | COT - LCPL - Plumbing Roof Drains | Passed | ||
09/19/2023 | COT - LCME - Mechanical Above Ceiling | Passed | Note:Inspection for East 12 units only. 9/19/23: inspections for West 12 units |
|
09/19/2023 | COT - LCEL - Electrical Above Ceiling | Passed | Note:Inspection for East 12 units only. 9/19/23: inspections for West 12 units |
|
09/19/2023 | COT - LCEL - Electrical Intermediate | Passed | Note:Inspection for East 12 units only. 9/19/23: inspections for West 12 units |
|
09/19/2023 | COT - LCME - Mechanical Intermediate | Passed | Note:Inspection for East 12 units only. 9/19/23: inspections for West 12 units |
|
09/19/2023 | COT - LCPL - Plumbing Intermediate | Passed | Note:Inspection for East 12 units only. 9/19/23: inspections for West 12 units |
|
09/19/2023 | COT - LCBU - Firewall/Fire Barrier/Firestop | Passed | Note:Inspection for East 12 units only. 9/19/23: inspections for West 12 units |
|
09/19/2023 | COT - LCPL - Plumbing Above Ceiling | Passed | Note:Inspection for East 12 units only. 9/19/23: inspections for West 12 units |
|
01/19/2024 | COT - LCEL - Service Upgrade | Passed | ||
01/23/2024 | COT - LCBU - Framing | Passed | ||
01/23/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
05/23/2024 | COT - FCON - Alarm - Final | Passed | ||
05/23/2024 | COT - FCON - Sprinkler - Final | Passed | ||
05/31/2024 | COT - FCON - Fire - Final | Passed | ||
05/31/2024 | COT - LCEL - Outdoor Lighting | Passed | ||
06/11/2024 | ENGR Engineering Final | Passed | Building 5 Complete - Approved for C of O per prior inspections by David Roberts. | |
06/11/2024 | COT - LCEL - Electrical Progress | Passed | ||
06/11/2024 | COT - LCBU - Building Above Ceiling | Passed | ||
06/11/2024 | COT - LCME - Mechanical Progress | Passed | ||
06/11/2024 | COT - LCBU - Sustainability | Passed | ||
06/11/2024 | COT - LCBU - Building Progress | Passed | ||
06/11/2024 | COT - LCPL - Plumbing Progress | Passed | ||
06/11/2024 | COT - LCME - Mechanical Final | Passed | ||
06/11/2024 | BULD - Electrical Clearance | Passed | ||
06/11/2024 | COT - LCPL - Plumbing Final | Passed | ||
06/13/2024 | COT - LCEL - Electrical Final | Passed | Corrections were made. 6/13/2024 | |
06/13/2024 | COT - LCBU - Building Final | Passed | Corrections were made. 6/13/2024 Okay for CofO. |