Permit: T22CM01444
Permit Details
Apply Date:
03/01/2022
Applicant:
Andrea Flood
Description:
SFR F40G19 T19-M0038
Outstanding Activity Conditions
Permit Number - T22CM01444
Permit Status: Issued
Permit Description: SFR F40G19 T19-M0038
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
03/01/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
03/01/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
03/01/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
03/01/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
03/01/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-052 ISACCEPTED AND RELEASED BY PCRWRD |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM01444
Permit Description: SFR F40G19 T19-M0038
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/29/2022 | COT - RSPL - Sewer | Passed | {Activity date: 03/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
03/29/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 03/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
04/07/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 04/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
04/07/2022 | COT - RSBU - Preslab | Passed | {Activity date: 04/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
04/07/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 04/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
04/07/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 04/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
06/01/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 06/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
06/01/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 06/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
11/29/2022 | BULD - Electrical Clearance | Passed | TEP ECO | |
11/29/2022 | COT - RSPL - Yard Water Line | Passed | ||
11/29/2022 | COT - RSPL - Gas Pressure Test | Passed | ||
11/29/2022 | COT - LCBU - Framing | Passed | ||
11/29/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/29/2022 | COT - RSEL - Construction Power | Passed | TEP ECO | |
12/16/2022 | COT - HCBU - Interior Shear Bracing | Passed | ||
02/23/2023 | COT - BULD - SWG Clearance | Passed | SWG clearance required | |
02/23/2023 | COT - RSPL - Plumbing Final | Passed | ||
03/24/2023 | RSME - Mechanical Progress | Passed | ||
03/24/2023 | RSBU - Building Final | Passed | Building is complete. Okay to issue Level 4 C of O. | |
03/24/2023 | COT - RSME - Mechanical Final | Passed | Mechanical equipment is installed and operational. | |
03/24/2023 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting installed and operational. | |
03/24/2023 | COT - RSEL - Electrical Final | Passed | Electrical panel is properly marked. Photo eye installed on garage door. GFCI receptacles installed in kitchen. AFCI breakers installed in panel for outlets in bedrooms and living areas. |