Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
02/24/2022
Applicant:
Andrea Flood
Description:
SFR F50A19 T19-M0034

Permit Reviews

Permit Number - T22CM01375
Permit Status: Issued
Permit Description: SFR F50A19 T19-M0034
Start Date Submittal Complete Date Status  
04/03/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/07/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM01375
Permit Status: Issued
Permit Description: SFR F50A19 T19-M0034
Total Outstanding Activity Conditions - 2
Date Name
02/24/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
02/24/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-052 ISACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM01375
Permite Description: SFR F50A19 T19-M0034
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/23/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass pex must be 12 inches from all recessed lighting found 2 locations
11/23/2022 COT - LCBU - Framing N/A Partial Pass missing second king stud at rear double trust

Completed Inspections

Permit Status: Issued
Permit Number: T22CM01375
Permit Description: SFR F50A19 T19-M0034
Total Completed Inspections - 19
Date Description Inspector Results Comments
04/01/2022 COT - RSPL - Yard Water Line Passed {Activity date: 04/01/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
04/01/2022 COT - RSPL - Sewer Passed {Activity date: 04/01/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
04/01/2022 COT - RSPL - Rough Soil Passed {Activity date: 04/01/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
04/12/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 04/12/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
04/12/2022 COT - RSBU - Preslab Passed {Activity date: 04/12/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
04/12/2022 COT - RSEL - Electrical Underground Passed {Activity date: 04/12/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
04/12/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 04/12/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
06/01/2022 COT - RSBU - Roof Nailing Passed {Activity date: 06/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
06/01/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 06/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
11/23/2022 COT - RSEL - Construction Power Passed
11/28/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/28/2022 COT - LCBU - Framing Passed
12/16/2022 COT - HCBU - Interior Shear Bracing Passed
02/14/2023 COT - BULD - SWG Clearance Passed SWG for meter only
03/24/2023 RSBU - Building Final Passed Electrical panel is properly marked. Photo eye installed on garage door. GFCI receptacles installed in kitchen. AFCI breakers installed in panel for outlets in bedrooms and living areas.
03/24/2023 COT - RSEL - Electrical Final Passed Electrical panel is properly marked. Photo eye installed on garage door. GFCI receptacles installed in kitchen. AFCI breakers installed in panel for outlets in bedrooms and living areas.
03/24/2023 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is installed.
03/24/2023 COT - RSME - Mechanical Final Passed Mechanical equipment is installed and operational.
03/24/2023 COT - RSPL - Plumbing Final Passed Plumbing fixtures are installed and operational

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW
1_WASTEWATER_V1.PDF DOCUMENTS VIEW