Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
MULTI FAMILY OTHER
Address NEW:
430 E YAVAPAI RD 3-4
Apply Date:
02/22/2022
Applicant:
Silverado Rooter and Plumbing
Description:
Run new gas pipe to water heaters in homes and a/c heater units on roof Summary ~ I will get a permit to run new gas lines from gas meters to appliances. ~ I will run new gas pipe mains from gas meters up the wall where gas meters are located… ~ I will plumb in a branch on both mains to service a/c heater units on roof… ~ I will run main pipes down through roof on both 3 and 4 down to water heaters…. ~ I will make proper connections at appliances up to code…. ~ I will secure pipes to wall and roof and add flashings where roof is penetrated with gas pipe…. ~ I will call gas company and inform them that the work is complete and ask them to inspect work…
Contractors:
  • Silverado Rooter and Plumbing

Permit Reviews

Permit Number - T22CM01286
Permit Status: Final
Permit Description: Run new gas pipe to water heaters in homes and a/c heater units on roof Summary ~ I will get a permit to run new gas lines from gas meters to appliances. ~ I will run new gas pipe mains from gas meters up the wall where gas meters are located… ~ I will plumb in a branch on both mains to service a/c heater units on roof… ~ I will run main pipes down through roof on both 3 and 4 down to water heaters…. ~ I will make proper connections at appliances up to code…. ~ I will secure pipes to wall and roof and add flashings where roof is penetrated with gas pipe…. ~ I will call gas company and inform them that the work is complete and ask them to inspect work…
Start Date Submittal Complete Date Status  
02/22/2022 OTHER 02/23/2022 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T22CM01286
Permit Description: Run new gas pipe to water heaters in homes and a/c heater units on roof Summary ~ I will get a permit to run new gas lines from gas meters to appliances. ~ I will run new gas pipe mains from gas meters up the wall where gas meters are located… ~ I will plumb in a branch on both mains to service a/c heater units on roof… ~ I will run main pipes down through roof on both 3 and 4 down to water heaters…. ~ I will make proper connections at appliances up to code…. ~ I will secure pipes to wall and roof and add flashings where roof is penetrated with gas pipe…. ~ I will call gas company and inform them that the work is complete and ask them to inspect work…
Total Completed Inspections - 3
Date Description Inspector Results Comments
02/28/2022 GAS CLEARANCE TGAUSP Approved CODE
02/28/2022 PLUMBING - FINAL TGAUSP Approved Approved
02/28/2022 PLUMBING - GAS PRESSURE TEST TGAUSP Approved Approved, clearance was called into SWG at 11:45am for gas reconnection

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GAS PIPING TEMPLATE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GAS PIPING TEMPLATE.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW