Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
6554 E BARROW ST
Apply Date:
02/18/2022
Applicant:
Rosebelle Ann Sanoria
Description:
Installation of 10.80KW PV System/MPU 200A

Permit Reviews

Permit Number - T22CM01253
Permit Status: Issued
Permit Description: Installation of 10.80KW PV System/MPU 200A
Start Date Submittal Complete Date Status  
02/18/2022 OTHER 04/12/2022 COMPLETED Review Details

Conditions

Permit Number - T22CM01253
Permit Status: Issued
Permit Description: Installation of 10.80KW PV System/MPU 200A
Date Description Comments
02/18/2022 THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70.

Completed Inspections

Permit Status: Issued
Permit Number: T22CM01253
Permit Description: Installation of 10.80KW PV System/MPU 200A
Total Completed Inspections - 4
Date Description Inspector Results Comments
07/06/2022 COT - RSEL - Service Upgrade Passed {Activity date: 07/06/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap
Called TEP at 2:05} ; {Activity date: 05/16/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Canceled by contractor, Jeremy.}
09/20/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 09/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - CODE DGC} ; {Activity date: 07/06/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - CODE INCR}
09/20/2022 RSBU - Building Final Passed {Activity date: 09/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/14/2022; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by VVERA1 - nr}
09/20/2022 COT - RSEL - Electrical Final Passed {Activity date: 09/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, please send DGC Clearance to TEP for the solar meter} ; {Activity date: 09/14/2022; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by VVERA1 - nr

Miscommunication somewhere, did not allow for this inspection today. The message given me, was for Colton’s #, but he was working in Prescott Valley today. He didn’t have his phone on, to answer my messages from throughout the day, until about 2pm.
Please recall for inspection and sure to leave the contact # for the tech on site, to perform the virtual inspection.
Note: 99% of all Tucson solar inspections are done virtually.
} ; {Activity date: 07/06/2022; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by VVERA1 - nr
Need solar for final

Clear incr}

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW