Permit: T22CM01253
Permit Details
Apply Date:
02/18/2022
Applicant:
Rosebelle Ann Sanoria
Description:
Installation of 10.80KW PV System/MPU 200A
Permit Reviews
Permit Number - T22CM01253
Permit Status: Issued
Permit Description: Installation of 10.80KW PV System/MPU 200A
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/18/2022 | OTHER | 04/12/2022 | COMPLETED |
Conditions
Permit Number - T22CM01253
Permit Status: Issued
Permit Description: Installation of 10.80KW PV System/MPU 200A
Date | Description | Comments |
---|---|---|
02/18/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM01253
Permit Description: Installation of 10.80KW PV System/MPU 200A
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/06/2022 | COT - RSEL - Service Upgrade | Passed | {Activity date: 07/06/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap Called TEP at 2:05} ; {Activity date: 05/16/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Canceled by contractor, Jeremy.} |
|
09/20/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 09/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - CODE DGC} ; {Activity date: 07/06/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - CODE INCR} | |
09/20/2022 | RSBU - Building Final | Passed | {Activity date: 09/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/14/2022; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by VVERA1 - nr} | |
09/20/2022 | COT - RSEL - Electrical Final | Passed | {Activity date: 09/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, please send DGC Clearance to TEP for the solar meter} ; {Activity date: 09/14/2022; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by VVERA1 - nr Miscommunication somewhere, did not allow for this inspection today. The message given me, was for Colton’s #, but he was working in Prescott Valley today. He didn’t have his phone on, to answer my messages from throughout the day, until about 2pm. Please recall for inspection and sure to leave the contact # for the tech on site, to perform the virtual inspection. Note: 99% of all Tucson solar inspections are done virtually. } ; {Activity date: 07/06/2022; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by VVERA1 - nr Need solar for final Clear incr} |